/SAPAPO/PAGT_HEUR -

The following messages are stored in message class /SAPAPO/PAGT_HEUR: .
It is part of development package /SAPAPO/AGTES in software component SCM-APO-PPS. This development package consists of objects that can be grouped under "Heuristic settings".
Message Nr
Message Text
000No planned orders for rescheduling found
001Error during the read of planned orders via resource selection
002
003Error by changing activity status (to de-allocated) in LiveCache
004Error by creation of period block
005Error by creation of period (day/week)
006Error during reexplosion of order &1 for product &2 in location &3
007Connection to LC failed
008LiveCache error occured
009Application error while scheduling occured (e.g. plg. intervals violated)
010Following planned orders could not be rescheduled infinitely:
011Order number &1 for product &2 in period [&3, &4]
012On resource &1, mode number &2
013Following planned orders could not be rescheduled finitely:
014Rescheduling of order &1 for product &2 in &3 within PTF not allowed
015
016
017Error during deallocation of activities
018No alternative PPM/PDS available for order &1 product &2, period [&3, &4]
019No valid input data applied
020No PPM/PDS to select (order &1); scheduling only with original PPM/PDS
021Heuristic settings variant from batch processing UI could not be applied
022Period for material &1 could not be determined
023Successful scheduling attempt: Order &1 in period [&2, &3]
024Maximum number of periods backwards reached; finite scheduling stopped
025Scheduling failed for &1 order
027Order &1 successfully reexploded using PPM/PDS &2
028No orders left in selection content after filtering by settings
029Heuristic is now closed without result
030&1 orders cannot be scheduled finitely and are now scheduled infinitely
031Successful deallocation of all infinite scheduled orders
032Successful finite scheduling after PPM/PDS switch
033PPM/PDS resources downtimes could not be determined
034Change of order &1 in liveCache failed after reexplosion
035Error while reexplosion of order &1 using PPM/PDS &2
036Enter mandatory parameter 'Maximum number of periods backwards'
037All valid periods processed without solution
038Target period &1 not included in period grid
039Maximum limit of scheduling attempts reached - Infinite scheduling
040Error while reading capacity information for main resource from liveCache
042These resources are ignored during shift determination
043Bucket schema of (some) resources not maintained as 'Daily (Shift)'
044Chosen planning mode 'Bucket Planning' does not support other schemas
103Input data check started
104Scheduling content computation started
105Scheduling process started
106Content determination (based on selected products) started
107Content determination (based on selected resources) started
108Content determination (based on selected orders) started
109Order data loading ...
110PPM/PDS data loading ...
111Sorting process according to sort sequence started
112Period creation started
113Orders for material &3 in period [&1, &2] are scheduled
114Start rescheduling of failed orders in previous period [&1, &2]
115PPM/PDS switch period reached; switch started in period [&1, &2]
116Start reexplosion process in period [&1, &2]
117Scheduling errors occured while finite scheduling
118Start of final infinite scheduling of failed orders
119Final deallocation of infinite scheduled orders has started
120Scheduling errors occured while infinite scheduling
121Finite scheduling of reexploded orders
122Shift determination process started
200Max. no. of periods for scheduling < no. of periods for PPM/PDS switch!
201Applied heuristic variant &1 does not exist! No settings changed!
202Settings from heuristic variant &1 has been adopted!
203No valid variant applied, so no settings could be determined!
204Heuristic with technical name &1 has no customizing settings assigned!
205Error while calling sorting popup!
206No settings variant has been applied
207Settings for heuristic from standard customizing restored
Privacy Policy