/SAPAPO/PP_OPTIMIZER - Optimizer Messages
The following messages are stored in message class /SAPAPO/PP_OPTIMIZER: Optimizer Messages.
It is part of development package /SAPAPO/PPO in software component SCM-APO-PPS-PPO. This development package consists of objects that can be grouped under "Production Planning Optimization".
It is part of development package /SAPAPO/PPO in software component SCM-APO-PPS-PPO. This development package consists of objects that can be grouped under "Production Planning Optimization".
Message Nr ▲ | Message Text |
---|---|
000 | &1 messages with number &2 have been suppressed |
001 | Production process model/PDS &1: Invalid rounding limit |
002 | Transportation lane &1: Invalid rounding limit |
003 | &1 messages with number &2 have been suppressed |
007 | No production process models/PDS are defined |
010 | Invalid Priority Internal Limits |
011 | No transportation lanes are defined |
017 | There is no demand defined |
020 | Product &1: Only valid outside of the planning horizon |
021 | Product &1: Only valid outside of the planning horizon |
024 | Resource &1: Capacity can be increased free of charge |
025 | Location &1, product &2: Fixed orders exist |
028 | Product &1: Not assigned to a location |
029 | Location &1: No products assigned |
031 | Safety stock violation does not incur penalty costs |
035 | Product &2: Invalid, but has a positive minimum stock level |
039 | Product &1 is not consuming any storage capacity |
041 | Product &1: No costs are incurred when surplus is destroyed |
043 | Resource &1: Overload not taken into account |
044 | Resource &1: Not available or has no available capacity |
045 | Resource &1: increase capacity overload is not taken into account |
046 | Resource &1: No available capacity in time frame &2 to &3 |
049 | Transportation resource &1: The capacity is not valid |
051 | Transportation lane &1: Shipment duration rounded to 0 |
052 | Transportation lane &1: No products assigned |
053 | Product &1 at location &2: Cannot be shipped over any transportation lane |
057 | Product &2: Maximum number of lots is 0 |
059 | Transportation lane &1: Invalid limits for the number of lots |
061 | Product &2: Transportation lot size is 0 |
063 | Product &1 does not consume any transportion capacity |
066 | Product &1: Opening stock not possible |
067 | Product &1: A fixed stock change is not possible |
068 | Transportation resource &1: Piecewise linear cost function not possible |
069 | Production process model/PDS &1: Invalid limits for lot sizes |
073 | Production process model/PDS &1: Cannot be executed |
075 | Production process model/PDS &1: Cannot be executed |
077 | Production process model/PDS &1: Inconsistent resource usage |
079 | Location &1: Invalid limits for external procurement |
081 | Production process model/PDS &1: Invalid limits for production quantities |
090 | Product &2: Costs for delayed deliveries are missing |
092 | Product &2: Costs for not delivering are missing |
098 | Location &1, product &2: Demand cannot be fulfilled |
099 | Calling &1 for not supported application &2, only supporting &3 |
100 | Product &2: Invalid opening stock |
109 | Transportable product &1: Not assigned to location |
111 | Production process model/PDS &1: Cannot be executed |
112 | Resource &1: Discrete increase not considered |
113 | Transportation lane &1, product &2: Minimum transportn lot not considered |
114 | Transportation lane &1: Discrete number of vehicles not considered |
115 | Production process model/PDS &1: Discrete lot size not considered |
116 | Production process model/PDS &1: Minimum production lot not considered |
117 | Storage resource &1: Not available or has no available capacity |
120 | Transportable product &1: Discrete lot size not considered |
121 | Transportation lane &1, product &2: Cost function not considered |
122 | Transportation lane &1: Discreteness not considered |
123 | Transportation lane &1: Discreteness and cost function not recommended |
124 | Transportation lane &1: Piecewise linear cost function not considered |
125 | Transportation resource &1: Discrete for continuous transportation lane |
126 | Demand for product &2 at location &1 not allowed |
129 | Product &1 at location &2 does not consume any handling-in capacity |
130 | Product &1 at location &2 does not consume any handling-out capacity |
131 | Product &1 at location &2: Procurement not allowed |
132 | Production process model/PDS &1: Execution not allowed |
133 | Product &1 at transportation lane &2: Stock transfer not allowed |
134 | Product &1 at location &2: Stock not allowed |
135 | Product &1 at location &2: Demand cannot be fulfilled |
136 | Location &1, product &2: Safety stock is inconsistent |
137 | Product &1 at location &2: Inconsistent penalty for not delivering |
138 | Product &1 at location &2: Inconsistent delay penalty |
139 | Product &1 at location &2: Inconsistent opportunity costs |
140 | Product &1: Shelf life not uniform |
141 | Product &1: Costs for production exceed costs for not delivering |
142 | Product &1:Costs for external procurement exceed costs for not delivering |
143 | Product &1: Costs for storage exceed costs for not delivering |
144 | Product &1: Costs for transport exceed costs for not delivering |
145 | Transportation lane &1 cannot be used for product &2 |
146 | Production process model/PDS &1: Cannot be executed |
147 | Product &1 at location &2: Are costs for external procurement ok? |
148 | Product &1 at transportation lane &2: Are transportation costs ok? |
149 | Production process model/PDS &1 at location &2: Are costs ok? |
150 | Resource &1: Are costs for capacity increase ok? |
151 | Product &1 at location &2: External procurement cost function incomplete |
152 | Product &1 at transportation lane &2: Incomplete transportn cost function |
153 | Production process model/PDS &1 at location &2: Incomplete cost function |
154 | Resource &1: incomplete cost function for capacity increase |
155 | Product &2 in location &1: Safety stock contradicts maximum stock |
156 | Product &2 at location &1: Unneccessary material destruction |
157 | PPM/PDS &1 is using more than 1 resource for lot size planning |
158 | Production process model/PDS &1: Fixed resource consumption not allowed |
159 | Production process model/PDS &1: Cannot be executed |
160 | PPM/PDS &3 cannot be run in lot size planning horizon |
161 | No fixed consumption of resource &2 by production process model/PDS &1 |
162 | Production process model/PDS &1: Cost function is missing |
163 | Product &1 at location &2: Dynamic safety stock > shelf life |
164 | Product &2 at location &3: COM error &1 |
167 | Product &1 at location &2: Safety stock violation costs |
168 | Product &1 at location &2: Safety stock for a non-valid product |
169 | Production process model/PDS &1: Execution ends outside of validity per. |
171 | Product &1 at location &2: External procurement of larger qty costs less |
172 | Production process model/PDS &1 at loc. &2: Larger no. lots costs less |
173 | Transportation lane &1: Larger number of means of transport costs less |
174 | Product &1 at location &2: Shelf life costs are lower than storage costs |
179 | Safety stock costs for product &1 at location &2 are too low |
180 | Switching off the data consistency check is not recommended |
182 | Product &1 at location &2 has a negative days' supply |
184 | Costs for safety days' supply of product &1 at location &2 are increasing |
185 | Shelf life violation costs of product &1 at location &2 are decreasing |
186 | Location &1, product &2: Stock balance violation |
189 | Safety stock costs for product &1 at location &2 are too low |
190 | Product &1 at transportation lane &2: PPM/PDS does not exist |
194 | PPM/PDS &4: Lot size ignored |
199 | Product &1 at location &2: Unsuitable storage costs |
200 | Product &1 at location &2: no costs for violation of maximum stock level |
201 | The error that occurred will be ignored |
202 | The error that occurred causes optimization to terminate |
203 | Problem simplified by removing discrete constraints |
204 | Problem simplified by removing fixed requirements |
205 | Runtime increased by &1 seconds |
206 | Production process model/PDS &1: Discrete constraints violated |
207 | Product &1 at transportation lane &2: Discrete constraints violated |
211 | Priority &1 for product &2 is ignored |
214 | Location &1, prod. &2: rcpt lower bound is greater than rcpt upper bound |
215 | Location &1, product &2: negative receipt upper or lower bound |
216 | Location &1, product &2: Costs for violating receipt bound are negative |
217 | Location &1, product &2: receipt upper and lower bounds are redundant |
218 | Location &1, product &2: receipt upper or lower bound is redundant |
220 | Quota arrangement &1 contains redundant items |
221 | Quota arrangement &1 contains redundant items |
222 | Quota arrangement &1 is redundant |
223 | Quota arrangement &1 is redundant |
224 | Quota arrangement &1 contains redundant items |
225 | Quota arrangement &1 contains items with the same product flows |
226 | Setup matrix &1 is empty |
228 | No setup matrix assigned to resource &1 |
229 | Setup matrix &1: Triangle inequality violated |
230 | PPM/PDS &1 uses two resources for sequence-dependent lot-size planning |
231 | PPM/PDS &1 without setup key uses resources with setup matrixes |
232 | Setup key for PPM/PDS &1 is not maintained in setup matrix &4 |
233 | All demand is frozen |
234 | Product &2 cannot be substituted by product &3 |
235 | Product decomposition with cross-period lot-size planning is used |
236 | Duration of PPM/PDS &1 is too long |
237 | Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4 |
238 | Product &1 at location &2 is referenced by the two FFF classes &3 and &4 |
239 | Minimum capacity defined for a non-production resource &1 in bucket &2 |
250 | COM error &1 when deleting planned order |
251 | COM error &1 when deleting stock transfer |
273 | Not enough memory |
274 | Runtime limit set using dual solution method |
275 | Optimum solution found |
276 | LP is unbounded |
277 | Run time limit reached: Feasible solution found |
278 | Run time limit reached: No solution found |
279 | Optimizer input data: Reference not valid |
280 | Error during download from application server |
281 | Error during upload to application server |
282 | Error setting up connection to application server |
285 | Infeasible problem |
286 | Fixed partial problem cannot be solved |
287 | Fixed partial problem cannot be solved |
293 | A duplicate key exists in table &3 |
294 | Table &3: Referential integrity violated |
295 | A duplicate key exists in table &3 |
296 | Table &3: Referential integrity violated |
297 | Incorrect GUID in table &3 |
298 | A duplicate key exists in table &3 |
299 | Table &3: Referential integrity violated |
300 | Optimizer: Input data inconsistent |
301 | Writing data again; attempt number: &1 |
400 | Penalty costs for non-delivery too low |
401 | Product &1 in location &2: Non-delivery penalty costs too low |
402 | Penalty costs for safety stock shortfall are too low |
403 | Product &1 in location &2: Safety stock penalty costs too low |
404 | Shortfall quantities due to suboptimal solution |
405 | Safety stock shortfall due to suboptimal solution |
406 | No explanations necessary |
407 | Capacity analysis: Priority &1 |
408 | Upper Limit Analysis: Priority &1 |
409 | Product availability analysis: Priority &1 |
410 | Lead time analysis: Priority &1 |
411 | Cost analysis: Priority &1 |
412 | Suboptimality Analysis: Priority &1 |
413 | Missing quantities could not be fully explained |
414 | Missing quantites could be fully explained |
415 | Upper Limit Analysis |
416 | Capacity Analysis |
417 | Product Availability Analysis |
418 | Lead Time Analysis |
419 | Shortfall of safety stock not fully explainable |
420 | Shortfall of safety stock fully explainable |
421 | CPU time limit reached |
422 | No explanation found |
423 | Penalty costs analysis |
424 | Missing Quantity After Limit Analysis: &1% |
425 | Safety Stock Shortfall After Limit Analysis: &1% |
426 | Missing Quantity After Capacity Analysis: &1% |
427 | Safety Stock Shortfall After Capacity Analysis: &1% |
428 | Missing Quantity After Product Availability Analysis: &1% |
429 | Safety Stock Shortfall After Product Availability Analysis: &1% |
430 | Missing Quantity After Lead Time Analysis (Horizons): &1% |
431 | Safety Stock Shortfall After Lead Time Analysis (Horizons): &1% |
432 | Missing Quantity After Lead Time Analysis (Past): &1% |
433 | Safety Stock Shortfall After Lead Time Analysis (Past): &1% |
434 | Missing Quantity After Cost Analysis: &1% |
435 | Safety Stock Shortfall After Cost Analysis: &1% |
444 | Overflow caused by a too large amount of results data |
445 | Overflow caused by a too large amount of results data |
450 | Overload at storage resource &1 |
451 | Surplus of product &1 at location &2 |
452 | Stock of product &1 at location &2 above soft upper bound |
600 | Optimizer: Internal error occurred |
777 | Available memory on optimization server is low (available: &1%) |
801 | Starting optimization run |
802 | Loading parameters |
803 | Loading planning data |
804 | Checking data consistency |
805 | Starting time decomposition |
806 | Starting product decomposition |
807 | Extracting part of problem |
808 | Starting primal simplex algorithm |
809 | Starting dual simplex algorithm |
810 | Starting interior point method |
811 | Writing results |
812 | Completing optimization run |
813 | Starting partial search |
814 | Starting full search |
815 | Select optimization parameters |
816 | Solution found |
817 | Improving solution |
818 | Find start solution |
819 | End of calculation |
820 | Starting resource decomposition |
821 | Starting Automatic Cost Generation |
822 | Starting preallocation for product decomposition |
823 | Finished preallocation for product decomposition |
824 | Starting next loop of product decomposition |
825 | Finished product decomposition |
826 | Finished time decomposition |
827 | Finished resource decomposition |
828 | Starting priority decomposition |
829 | Finished priority decomposition |
830 | Optimizer run failed without result (see trace file) |
831 | Optimizer run failed without result. |