/SAPAPO/PROD - APO: messages for the production process model
The following messages are stored in message class /SAPAPO/PROD: APO: messages for the production process model.
It is part of development package /SAPAPO/BOM in software component SCM-APO-MD-PPM. This development package consists of objects that can be grouped under "Production Process Model".
It is part of development package /SAPAPO/BOM in software component SCM-APO-MD-PPM. This development package consists of objects that can be grouped under "Production Process Model".
Message Nr ▲ | Message Text |
|---|---|
| 000 | Material & not yet available |
| 001 | Production process model/product version already exists |
| 002 | Location & does not yet exist |
| 003 | Production process model is not yet available |
| 004 | Enter a positive quantity |
| 005 | Minimum quantity higher than maximum quantity |
| 006 | Production process model saved |
| 007 | From... date later than To...date |
| 008 | Enter a date |
| 009 | Operation segment saved |
| 010 | Operation segment already exists |
| 011 | An operation to be selected or maintained |
| 012 | Components saved |
| 013 | Resource & does not yet exist |
| 014 | Enter a positive duration |
| 015 | Resource saved |
| 016 | Enter a positive capacity |
| 017 | Component already exists |
| 018 | No operation segment exists |
| 019 | Describe the operation |
| 020 | Product saved |
| 021 | Storage location does not exist |
| 022 | Maintain input/output indicator |
| 023 | Input-/output indicator does not exist -> F4 |
| 024 | Maintain type of material consumption |
| 025 | Type of material consumption not defined -> F4 |
| 026 | Enter a consumption quantity |
| 027 | Data of production process model saved |
| 028 | Mode saved |
| 029 | Resource already exists |
| 030 | Select a line |
| 031 | Resource &1 at location &2 does not exist |
| 032 | End date entered automatically |
| 033 | Start date entered automatically |
| 034 | Start date later than end date |
| 035 | Periods overlap |
| 036 | Periods not gap-free |
| 037 | Enter end date |
| 038 | Enter start date |
| 039 | Production process model deleted |
| 040 | Operation segment deleted |
| 041 | Operation deleted |
| 042 | Consistency check successful |
| 043 | Operation segment cannot reference itself |
| 044 | Activity does not exist |
| 045 | PPM &1: Activity net contains a cycle |
| 046 | PPM &1: Activity net is not connected |
| 047 | Minimum distance between operation segments larger than maximum distance |
| 048 | Operation description is overwritten |
| 049 | Resource is not assigned to the mode |
| 050 | Enter a time unit |
| 051 | Logical item deleted |
| 052 | Material consumption/material receipt deleted |
| 053 | Resource load deleted |
| 054 | Mode deleted |
| 055 | Relationship deleted |
| 056 | Scrap in % must lie between 0 and 100 |
| 057 | Material flow only along a start/end relationship |
| 058 | Material consumption is not maintained |
| 059 | Production process model already locked by user & |
| 060 | Specify at least one resource as calendar resource |
| 061 | No plan found |
| 062 | Either specify the location for the product or leave both blank |
| 063 | Specify a location |
| 064 | Specify use of production process model |
| 065 | Enter the plan number |
| 066 | Production process model saved and activated |
| 067 | Assignment of material <-> plan deleted |
| 068 | Assignment only possible if output products maintained |
| 069 | Maintain whole-number values |
| 070 | Maintain "DAY" as time unit |
| 071 | No location exists for material & |
| 072 | Plan text deleted |
| 073 | Text for product version deleted |
| 074 | Maintain an activity number |
| 075 | PPM number can no longer be used |
| 076 | Use a bucket resource |
| 077 | Resource &2 used in PPM &1 has no time-continuous capacity |
| 078 | Unit for resource & cannot be used |
| 079 | Mode already exists |
| 080 | Text for activity deleted |
| 081 | No minimum interval defined in the activities |
| 082 | Specify a type for activity & |
| 083 | Complete maintainance of combination of resource and location |
| 084 | Enter a text for the operation & |
| 085 | Internal error & |
| 086 | Operation &1, activity &2, mode &3, calendar resource &4, not created |
| 087 | Operation &1, activity &2, mode &3, calendar resource &4, not used |
| 088 | Mode &1 with resource load &2: Both have variable consumption |
| 089 | Planning object for peg ID &1 not found |
| 090 | Planning data for PPM &1 is inconsistent |
| 091 | Primary resource not maintained |
| 092 | PPM execution for source &1: A PP/DS plan was not found |
| 093 | No configuration can be determined |
| 094 | PPM execution for source &1: log. comp. &2 does not have a valid product |
| 095 | Plan &1 not valid for product &2 at time &3 |
| 201 | Changes not considered |
| 202 | Material does not accord with selection conditions |
| 203 | Location does not accord with selection conditions |
| 204 | The production version does not correspond with the selection |
| 205 | A production process model must contain at least one product |
| 206 | You cannot delete the primary resource |
| 207 | Planning area does not correspond to the selection conditions |
| 208 | Supplier does not corespond to the selection conditions |
| 300 | Material &1 from production version not in components list. |
| 301 | Validity period of product &1 in PPM longer than in component list |
| 302 | No activity is assigned to operation &1. |
| 303 | No session is assigned to activity &1 - &2. |
| 304 | No material is assigned to logical component &1 in operation &2 - &3. |
| 305 | Relationship between &1 - &2 in operation &3 w/o resources network ind. |
| 306 | Activities &1, &2 of operation &3 with different main resources |
| 307 | Activity network contains cycle. |
| 308 | Activity network is not coherent. |
| 309 | In operation &1 - &2 mode &3: Main resource not maintained as resource. |
| 310 | Mode &1 must contain ONE calendar resource |
| 311 | More than one setup activity in operation &1 |
| 312 | Setup activity in operation &1 has relationships to preceding activities |
| 313 | Sequence-dependent setup in operation &1 not on single activity resource |
| 314 | No available capacity for multi-activity/bucket resource &1 in mode &2 |
| 315 | Activity &1 &2 has no automatically selectable mode |
| 316 | The relationship of activity &1 &2 references itself |
| 317 | An order-internal material flow is modeled on activity &1 &2 |
| 318 | Setup activity in operation & may only be end-start relation to successor |
| 319 | Setup activity in operatn &: Secondary res. should not have setup matrix |
| 320 | Order &1 has no activity |
| 321 | Concatenated PP/DS plan has been deleted |
| 322 | PP/DS plan number &1 does not exist |
| 323 | Cover flag can only be set for primary resource coupling |
| 324 | Minimum interval + float greater than maximum interval in mode &1 &2 &3 |
| 325 | A non end-start constraint type has been used in operation &1 |
| 326 | Use only one mode within the SNP activity &1 &2 |
| 330 | Modes must have identical coupling > activity name &1 &2 &3 &4 |
| 331 | PrimaryResources must have identical coupling > activity name &1 &2 &3 &4 |
| 332 | Covered primary resouce coupling - different capacities --> &1 &2 &3 &4 |
| 333 | Existence of secondary resources with time-dependent data in session &1 |
| 334 | Synchronization of activities for overlaps cannot be used for sec.res &1 |
| 335 | No setup matrix specified (operation &2) for primary resource &1 |
| 336 | Bucket and transport resources are not primary resources |
| 337 | A non end-start activity relationship has been created in the operatn &1 |
| 338 | Operation &1 has parallel activity relationships |
| 339 | Incorrect resource type &1 selected - choose single or multi-resource |
| 340 | Resource &1 should be set up in sequence, must be of type single |
| 341 | Assess at least one consumption (var./fixed) for the resource &1 |
| 342 | Type of cal. res. in mode &1 does not correspond to that of prim. res. |
| 343 | Only one setup activity was created in operation &1 |
| 344 | No setup activity can be modelled on multi-resources (resource &1) |
| 350 | No authorization for plan &1 and this function |
| 351 | No authorization for PPM &1 and this function |
| 352 | No authorization for location product &1 &2 and this function |
| 353 | No authorization for location &1 and this function |
| 354 | No authorization for product &1 and this function |
| 355 | No authorization for location resource(s) &1 &2 and this function |
| 501 | Entries in assignment table not allowed without entries in data table |
| 502 | New routing number &1 to be entered already exists in the database |
| 503 | New assignment table entries with change entries in data tab. not allowed |
| 504 | Change entries in table with new assignment table entries not allowed |
| 505 | No assignment entry exists for routing |
| 506 | Table entry to be newly created exists in the database |
| 507 | Table entry to be changed does not exist in the database |
| 508 | Table entry to be deleted does not exist in the database |
| 509 | Processing method is not supported |
| 510 | Checkbox structure does not exist for table entry |
| 511 | Operation does not exist in table PLANOPR |
| 512 | Activity &1 does not exist in table PLANACT |
| 513 | Predecessor activity does not exist in table PLANACT |
| 514 | Successor activity does not exist in table PLANACT |
| 515 | Primary resource does not exist in the system |
| 516 | Mode does not exist in table MODE |
| 517 | Resource does not exist |
| 518 | Logical component does not exist in table COMP |
| 519 | Material does not exist |
| 520 | Alternative time-dependent component does not exist in table COMPALT |
| 521 | Routing for successor activity does not exist |
| 522 | Primary resource (MODE) was not entered in table REQCAP |
| 523 | Chained PP/DS plan does not exist |
| 524 | Assigned cost profile does not exist |
| 525 | Plan &1 not activated due to missing bucket consumptions |
| 551 | Entries in assignment table not allowed without entries in data table |
| 552 | New PPM planning number &1 to be entered already exists in the database |
| 553 | New assignment table entries with change entries in data tab. not allowed |
| 554 | Change entries in table with new assignment table entries not allowed |
| 555 | No assignment entry exists for PPM |
| 556 | Routing does not exist in table PLAN |
| 557 | Material does not exist |
| 558 | Location does not exist |
| 559 | Combination log. components/mat. number/ end-date not in table COMPALT |
| 560 | Combination log. component/material no. not unique in table COMPALT |
| 561 | Setup group/setup key does not exist |
| 599 | Entry faulty: &1&2&3&4 |
| 600 | *** Messages for generation of a variable PPM *** |
| 601 | Missing entry in template operation table for operation &1 |
| 602 | Missing entry in template operation text table for operation &1 |
| 603 | Missing entry in template activity table ( &1 &2 ) |
| 604 | Missing entry in template mode table for activity &1 |
| 605 | Template PPM already copied, not possible to copy again |
| 606 | Missing entry in template copy table ( &1 &2 ) |
| 607 | Missing entry in template component table |
| 608 | Component to be copied cannot be clearly identified |
| 609 | Missing entry in template table of logical component &1 |
| 610 | Component is defined differently in the template component table |
| 611 | Logical component for item no. &1 and line sched. no. &2 not found |
| 612 | Physical component not found |
| 613 | Missing entry in template header table for order &1 |
| 614 | Template component table is empty |
| 615 | Different quantity units on nodes in operation no. & |
| 616 | Invalid copy operation after copying a complete template PPM |
| 617 | Invalid copy operation after complete copy of template PPM operation &1 |
| 618 | Missing accompanying entry in parameter &1 |
| 619 | Order was created with other PPM type (&1). Changing not possible |
| 620 | Error during PPM resolution |
| 621 | Units of measure for nodes are not identical |
| 622 | Quantity flow will be negative |
| 623 | Invalid copying action for activity &1 in operation &2 |
| 624 | Characteristics could not be processed because of inconsistencies |
| 625 | Copied operations not yet possible (only adopted operations) |
| 626 | Value '&1' for field &2 can only be used for main component |
| 627 | Value combinationen '&1', '&2' not allowed for field &3 (See long text) |
| 666 | Internal: & & & & |
| 700 | Propagation still used in orders |
| 701 | Characteristic propagation inconsistent |
| 702 | Characteristic propagation not yet activated |
| 800 | Position cursor on a line |
| 801 | First position the cursor on a line |
| 802 | Select at least one line for deletion |
| 803 | Date already exists |
| 804 | Required entry not made |
| 805 | Enter a "valid-to" date |
| 806 | Percentage yield must lie between 0 and 100 |
| 807 | Unit of measure has changed from & to & (Check values) |
| 808 | Time-dependent overriding of a(n) & not allowed |
| 809 | Entry of unit of resource consumption cancelled |
| 810 | You can't maintain version dependent params for active planning version |
| 857 | Order can only be changed in R/3 |
| 858 | Component &1 of PPM &2 not valid for explosion! |
| 859 | Several main products in PPM |
| 860 | PPM &1, mode &2: field overflow, capacity requirement for resource &3 |