/SAPAPO/PROD - APO: messages for the production process model

The following messages are stored in message class /SAPAPO/PROD: APO: messages for the production process model.
It is part of development package /SAPAPO/BOM in software component SCM-APO-MD-PPM. This development package consists of objects that can be grouped under "Production Process Model".
Message Nr
Message Text
000Material & not yet available
001Production process model/product version already exists
002Location & does not yet exist
003Production process model is not yet available
004Enter a positive quantity
005Minimum quantity higher than maximum quantity
006Production process model saved
007From... date later than To...date
008Enter a date
009Operation segment saved
010Operation segment already exists
011An operation to be selected or maintained
012Components saved
013Resource & does not yet exist
014Enter a positive duration
015Resource saved
016Enter a positive capacity
017Component already exists
018No operation segment exists
019Describe the operation
020Product saved
021Storage location does not exist
022Maintain input/output indicator
023Input-/output indicator does not exist -> F4
024Maintain type of material consumption
025Type of material consumption not defined -> F4
026Enter a consumption quantity
027Data of production process model saved
028Mode saved
029Resource already exists
030Select a line
031Resource &1 at location &2 does not exist
032End date entered automatically
033Start date entered automatically
034Start date later than end date
035Periods overlap
036Periods not gap-free
037Enter end date
038Enter start date
039Production process model deleted
040Operation segment deleted
041Operation deleted
042Consistency check successful
043Operation segment cannot reference itself
044Activity does not exist
045PPM &1: Activity net contains a cycle
046PPM &1: Activity net is not connected
047Minimum distance between operation segments larger than maximum distance
048Operation description is overwritten
049Resource is not assigned to the mode
050Enter a time unit
051Logical item deleted
052Material consumption/material receipt deleted
053Resource load deleted
054Mode deleted
055Relationship deleted
056Scrap in % must lie between 0 and 100
057Material flow only along a start/end relationship
058Material consumption is not maintained
059Production process model already locked by user &
060Specify at least one resource as calendar resource
061No plan found
062Either specify the location for the product or leave both blank
063Specify a location
064Specify use of production process model
065Enter the plan number
066Production process model saved and activated
067Assignment of material <-> plan deleted
068Assignment only possible if output products maintained
069Maintain whole-number values
070Maintain "DAY" as time unit
071No location exists for material &
072Plan text deleted
073Text for product version deleted
074Maintain an activity number
075PPM number can no longer be used
076Use a bucket resource
077Resource &2 used in PPM &1 has no time-continuous capacity
078Unit for resource & cannot be used
079Mode already exists
080Text for activity deleted
081No minimum interval defined in the activities
082Specify a type for activity &
083Complete maintainance of combination of resource and location
084Enter a text for the operation &
085Internal error &
086Operation &1, activity &2, mode &3, calendar resource &4, not created
087Operation &1, activity &2, mode &3, calendar resource &4, not used
088Mode &1 with resource load &2: Both have variable consumption
089Planning object for peg ID &1 not found
090Planning data for PPM &1 is inconsistent
091Primary resource not maintained
092PPM execution for source &1: A PP/DS plan was not found
093No configuration can be determined
094PPM execution for source &1: log. comp. &2 does not have a valid product
095Plan &1 not valid for product &2 at time &3
201Changes not considered
202Material does not accord with selection conditions
203Location does not accord with selection conditions
204The production version does not correspond with the selection
205A production process model must contain at least one product
206You cannot delete the primary resource
207Planning area does not correspond to the selection conditions
208Supplier does not corespond to the selection conditions
300Material &1 from production version not in components list.
301Validity period of product &1 in PPM longer than in component list
302No activity is assigned to operation &1.
303No session is assigned to activity &1 - &2.
304No material is assigned to logical component &1 in operation &2 - &3.
305Relationship between &1 - &2 in operation &3 w/o resources network ind.
306Activities &1, &2 of operation &3 with different main resources
307Activity network contains cycle.
308Activity network is not coherent.
309In operation &1 - &2 mode &3: Main resource not maintained as resource.
310Mode &1 must contain ONE calendar resource
311More than one setup activity in operation &1
312Setup activity in operation &1 has relationships to preceding activities
313Sequence-dependent setup in operation &1 not on single activity resource
314No available capacity for multi-activity/bucket resource &1 in mode &2
315Activity &1 &2 has no automatically selectable mode
316The relationship of activity &1 &2 references itself
317An order-internal material flow is modeled on activity &1 &2
318Setup activity in operation & may only be end-start relation to successor
319Setup activity in operatn &: Secondary res. should not have setup matrix
320Order &1 has no activity
321Concatenated PP/DS plan has been deleted
322PP/DS plan number &1 does not exist
323Cover flag can only be set for primary resource coupling
324Minimum interval + float greater than maximum interval in mode &1 &2 &3
325A non end-start constraint type has been used in operation &1
326Use only one mode within the SNP activity &1 &2
330Modes must have identical coupling > activity name &1 &2 &3 &4
331PrimaryResources must have identical coupling > activity name &1 &2 &3 &4
332Covered primary resouce coupling - different capacities --> &1 &2 &3 &4
333Existence of secondary resources with time-dependent data in session &1
334Synchronization of activities for overlaps cannot be used for sec.res &1
335No setup matrix specified (operation &2) for primary resource &1
336Bucket and transport resources are not primary resources
337A non end-start activity relationship has been created in the operatn &1
338Operation &1 has parallel activity relationships
339Incorrect resource type &1 selected - choose single or multi-resource
340Resource &1 should be set up in sequence, must be of type single
341Assess at least one consumption (var./fixed) for the resource &1
342Type of cal. res. in mode &1 does not correspond to that of prim. res.
343Only one setup activity was created in operation &1
344No setup activity can be modelled on multi-resources (resource &1)
350No authorization for plan &1 and this function
351No authorization for PPM &1 and this function
352No authorization for location product &1 &2 and this function
353No authorization for location &1 and this function
354No authorization for product &1 and this function
355No authorization for location resource(s) &1 &2 and this function
501Entries in assignment table not allowed without entries in data table
502New routing number &1 to be entered already exists in the database
503New assignment table entries with change entries in data tab. not allowed
504Change entries in table with new assignment table entries not allowed
505No assignment entry exists for routing
506Table entry to be newly created exists in the database
507Table entry to be changed does not exist in the database
508Table entry to be deleted does not exist in the database
509Processing method is not supported
510Checkbox structure does not exist for table entry
511Operation does not exist in table PLANOPR
512Activity &1 does not exist in table PLANACT
513Predecessor activity does not exist in table PLANACT
514Successor activity does not exist in table PLANACT
515Primary resource does not exist in the system
516Mode does not exist in table MODE
517Resource does not exist
518Logical component does not exist in table COMP
519Material does not exist
520Alternative time-dependent component does not exist in table COMPALT
521Routing for successor activity does not exist
522Primary resource (MODE) was not entered in table REQCAP
523Chained PP/DS plan does not exist
524Assigned cost profile does not exist
525Plan &1 not activated due to missing bucket consumptions
551Entries in assignment table not allowed without entries in data table
552New PPM planning number &1 to be entered already exists in the database
553New assignment table entries with change entries in data tab. not allowed
554Change entries in table with new assignment table entries not allowed
555No assignment entry exists for PPM
556Routing does not exist in table PLAN
557Material does not exist
558Location does not exist
559Combination log. components/mat. number/ end-date not in table COMPALT
560Combination log. component/material no. not unique in table COMPALT
561Setup group/setup key does not exist
599Entry faulty: &1&2&3&4
600*** Messages for generation of a variable PPM ***
601Missing entry in template operation table for operation &1
602Missing entry in template operation text table for operation &1
603Missing entry in template activity table ( &1 &2 )
604Missing entry in template mode table for activity &1
605Template PPM already copied, not possible to copy again
606Missing entry in template copy table ( &1 &2 )
607Missing entry in template component table
608Component to be copied cannot be clearly identified
609Missing entry in template table of logical component &1
610Component is defined differently in the template component table
611Logical component for item no. &1 and line sched. no. &2 not found
612Physical component not found
613Missing entry in template header table for order &1
614Template component table is empty
615Different quantity units on nodes in operation no. &
616Invalid copy operation after copying a complete template PPM
617Invalid copy operation after complete copy of template PPM operation &1
618Missing accompanying entry in parameter &1
619Order was created with other PPM type (&1). Changing not possible
620Error during PPM resolution
621Units of measure for nodes are not identical
622Quantity flow will be negative
623Invalid copying action for activity &1 in operation &2
624Characteristics could not be processed because of inconsistencies
625Copied operations not yet possible (only adopted operations)
626Value '&1' for field &2 can only be used for main component
627Value combinationen '&1', '&2' not allowed for field &3 (See long text)
666Internal: & & & &
700Propagation still used in orders
701Characteristic propagation inconsistent
702Characteristic propagation not yet activated
800Position cursor on a line
801First position the cursor on a line
802Select at least one line for deletion
803Date already exists
804Required entry not made
805Enter a "valid-to" date
806Percentage yield must lie between 0 and 100
807Unit of measure has changed from & to & (Check values)
808Time-dependent overriding of a(n) & not allowed
809Entry of unit of resource consumption cancelled
810You can't maintain version dependent params for active planning version
857Order can only be changed in R/3
858Component &1 of PPM &2 not valid for explosion!
859Several main products in PPM
860PPM &1, mode &2: field overflow, capacity requirement for resource &3
Privacy Policy