/SAPAPO/SNPOPT - Optimizer Messages
The following messages are stored in message class /SAPAPO/SNPOPT: Optimizer Messages.
It is part of development package /SAPAPO/MDRP in software component SCM-APO-SNP. This development package consists of objects that can be grouped under "SNP development".
It is part of development package /SAPAPO/MDRP in software component SCM-APO-SNP. This development package consists of objects that can be grouped under "SNP development".
Message Nr ▲ | Message Text |
|---|---|
| 000 | &1 messages with number &2 have been suppressed |
| 001 | Production process model/PDS &1: Invalid rounding limit |
| 002 | Transportation lane &1: Invalid rounding limit |
| 003 | &1 messages with number &2 have been suppressed |
| 007 | No production process models/PDS are defined |
| 010 | Invalid Priority Internal Limits |
| 011 | No transportation lanes are defined |
| 017 | There is no demand defined |
| 020 | Product &1: Only valid outside of the planning horizon |
| 021 | Product &1: Only valid outside of the planning horizon |
| 024 | Resource &1: Capacity can be increased free of charge |
| 025 | Location &1, product &2: Fixed orders exist |
| 028 | Product &1: Not assigned to a location |
| 029 | Location &1: No products assigned |
| 031 | Safety stock violation does not incur penalty costs |
| 035 | Product &2: Invalid, but has a positive minimum stock level |
| 039 | Product &1 is not consuming any storage capacity |
| 041 | Product &1: No costs are incurred when surplus is destroyed |
| 043 | Resource &1: Overload not taken into account |
| 044 | Resource &1: Not available or has no available capacity |
| 045 | Resource &1: increase capacity overload is not taken into account |
| 046 | Resource &1: No available capacity in time frame &2 to &3 |
| 049 | Transportation resource &1: The capacity is not valid |
| 051 | Transportation lane &1: Shipment duration rounded to 0 |
| 052 | Transportation lane &1: No products assigned |
| 053 | Product &1 at location &2: Cannot be shipped over any transportation lane |
| 057 | Product &2: Maximum number of lots is 0 |
| 059 | Transportation lane &1: Invalid limits for the number of lots |
| 061 | Product &2: Transportation lot size is 0 |
| 063 | Product &1 does not consume any transportion capacity |
| 066 | Product &1: Opening stock not possible |
| 067 | Product &1: A fixed stock change is not possible |
| 068 | Transportation resource &1: Piecewise linear cost function not possible |
| 069 | Production process model/PDS &1: Invalid limits for lot sizes |
| 073 | Production process model/PDS &1: Cannot be executed |
| 075 | Production process model/PDS &1: Cannot be executed |
| 077 | Production process model/PDS &1: Inconsistent resource usage |
| 079 | Location &1: Invalid limits for external procurement |
| 081 | Production process model/PDS &1: Invalid limits for production quantities |
| 090 | Product &2: Costs for delayed deliveries are missing |
| 092 | Product &2: Costs for not delivering are missing |
| 098 | Location &1, product &2: Demand cannot be fulfilled |
| 099 | Calling &1 for not supported application &2, only supporting &3 |
| 100 | Product &2: Invalid opening stock |
| 109 | Transportable product &1: Not assigned to location |
| 111 | Production process model/PDS &1: Cannot be executed |
| 112 | Resource &1: Discrete increase not considered |
| 113 | Transportation lane &1, product &2: Minimum transportn lot not considered |
| 114 | Transportation lane &1: Discrete number of vehicles not considered |
| 115 | Production process model/PDS &1: Discrete lot size not considered |
| 116 | Production process model/PDS &1: Minimum production lot not considered |
| 117 | Storage resource &1: Not available or has no available capacity |
| 120 | Transportable product &1: Discrete lot size not considered |
| 121 | Transportation lane &1, product &2: Cost function not considered |
| 122 | Transportation lane &1: Discreteness not considered |
| 123 | Transportation lane &1: Discreteness and cost function not recommended |
| 124 | Transportation lane &1: Piecewise linear cost function not considered |
| 125 | Transportation resource &1: Discrete for continuous transportation lane |
| 126 | Demand for product &2 at location &1 not allowed |
| 129 | Product &1 at location &2 does not consume any handling-in capacity |
| 130 | Product &1 at location &2 does not consume any handling-out capacity |
| 131 | Product &1 at location &2: Procurement not allowed |
| 132 | Production process model/PDS &1: Execution not allowed |
| 133 | Product &1 at transportation lane &2: Stock transfer not allowed |
| 134 | Product &1 at location &2: Stock not allowed |
| 135 | Product &1 at location &2: Demand cannot be fulfilled |
| 136 | Location &1, product &2: Safety stock is inconsistent |
| 137 | Product &1 at location &2: Inconsistent penalty for not delivering |
| 138 | Product &1 at location &2: Inconsistent delay penalty |
| 139 | Product &1 at location &2: Inconsistent opportunity costs |
| 140 | Product &1: Shelf life not uniform |
| 141 | Product &1: Costs for production exceed costs for not delivering |
| 142 | Product &1:Costs for external procurement exceed costs for not delivering |
| 143 | Product &1: Costs for storage exceed costs for not delivering |
| 144 | Product &1: Costs for transport exceed costs for not delivering |
| 145 | Transportation lane &1 cannot be used for product &2 |
| 146 | Production process model/PDS &1: Cannot be executed |
| 147 | Product &1 at location &2: Are costs for external procurement ok? |
| 148 | Product &1 at transportation lane &2: Are transportation costs ok? |
| 149 | Production process model/PDS &1 at location &2: Are costs ok? |
| 150 | Resource &1: Are costs for capacity increase ok? |
| 151 | Product &1 at location &2: External procurement cost function incomplete |
| 152 | Product &1 at transportation lane &2: Incomplete transportn cost function |
| 153 | Production process model/PDS &1 at location &2: Incomplete cost function |
| 154 | Resource &1: incomplete cost function for capacity increase |
| 155 | Product &2 in location &1: Safety stock contradicts maximum stock |
| 156 | Product &2 at location &1: Unneccessary material destruction |
| 157 | PPM/PDS &1 is using more than 1 resource for lot size planning |
| 158 | Production process model/PDS &1: Fixed resource consumption not allowed |
| 159 | Production process model/PDS &1: Cannot be executed |
| 160 | PPM/PDS &3 cannot be run in lot size planning horizon |
| 161 | No fixed consumption of resource &2 by production process model/PDS &1 |
| 162 | Production process model/PDS &1: Cost function is missing |
| 163 | Product &1 at location &2: Dynamic safety stock > shelf life |
| 164 | Product &2 at location &3: COM error &1 |
| 167 | Product &1 at location &2: Safety stock violation costs |
| 168 | Product &1 at location &2: Safety stock for a non-valid product |
| 169 | Production process model/PDS &1: Execution ends outside of validity per. |
| 171 | Product &1 at location &2: External procurement of larger qty costs less |
| 172 | Production process model/PDS &1 at loc. &2: Larger no. lots costs less |
| 173 | Transportation lane &1: Larger number of means of transport costs less |
| 174 | Product &1 at location &2: Shelf life costs are lower than storage costs |
| 179 | Safety stock costs for product &1 at location &2 are too low |
| 180 | Switching off the data consistency check is not recommended |
| 182 | Product &1 at location &2 has a negative days' supply |
| 184 | Costs for safety days' supply of product &1 at location &2 are increasing |
| 185 | Shelf life violation costs of product &1 at location &2 are decreasing |
| 186 | Location &1, product &2: Stock balance violation |
| 189 | Safety stock costs for product &1 at location &2 are too low |
| 190 | Product &1 at transportation lane &2: PPM/PDS does not exist |
| 194 | PPM/PDS &4: Lot size ignored |
| 199 | Product &1 at location &2: Unsuitable storage costs |
| 200 | Product &1 at location &2: no costs for violation of maximum stock level |
| 201 | The error that occurred will be ignored |
| 202 | The error that occurred causes optimization to terminate |
| 203 | Problem simplified by removing discrete constraints |
| 204 | Problem simplified by removing fixed requirements |
| 205 | Runtime increased by &1 seconds |
| 206 | Production process model/PDS &1: Discrete constraints violated |
| 207 | Product &1 at transportation lane &2: Discrete constraints violated |
| 211 | Priority &1 for product &2 is ignored |
| 214 | Location &1, prod. &2: rcpt lower bound is greater than rcpt upper bound |
| 215 | Location &1, product &2: negative receipt upper or lower bound |
| 216 | Location &1, product &2: Costs for violating receipt bound are negative |
| 217 | Location &1, product &2: receipt upper and lower bounds are redundant |
| 218 | Location &1, product &2: receipt upper or lower bound is redundant |
| 220 | Quota arrangement &1 contains redundant items |
| 221 | Quota arrangement &1 contains redundant items |
| 222 | Quota arrangement &1 is redundant |
| 223 | Quota arrangement &1 is redundant |
| 224 | Quota arrangement &1 contains redundant items |
| 225 | Quota arrangement &1 contains items with the same product flows |
| 226 | Setup matrix &1 is empty |
| 228 | No setup matrix assigned to resource &1 |
| 229 | Setup matrix &1: Triangle inequality for setup costs not fulfiled. |
| 230 | PPM/PDS &1 uses two resources for sequence-dependent lot-size planning |
| 231 | PPM/PDS &1 without setup key uses resources with setup matrixes |
| 232 | Setup key for PPM/PDS &1 is not maintained in setup matrix &4 |
| 233 | All demand is frozen |
| 234 | Product &2 cannot be substituted by product &3 |
| 235 | Product decomposition with cross-period lot-size planning is used |
| 236 | Duration of PPM/PDS &1 is too long |
| 237 | Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4 |
| 238 | Product &1 at location &2 is referenced by the two FFF classes &3 and &4 |
| 239 | Minimum capacity defined for a non-production resource &1 in bucket &2 |
| 250 | COM error &1 when deleting planned order |
| 251 | COM error &1 when deleting stock transfer |
| 273 | Not enough memory |
| 274 | Runtime limit set using dual solution method |
| 275 | Optimum solution found |
| 276 | LP is unbounded |
| 277 | Run time limit reached: Feasible solution found |
| 278 | Run time limit reached: No solution found |
| 279 | Optimizer input data: Reference not valid |
| 280 | Error during download from application server |
| 281 | Error during upload to application server |
| 282 | Error setting up connection to application server |
| 285 | Infeasible problem |
| 286 | Fixed partial problem cannot be solved |
| 287 | Fixed partial problem cannot be solved |
| 293 | A duplicate key exists in table &3 |
| 294 | Table &3: Referential integrity violated |
| 295 | A duplicate key exists in table &3 |
| 296 | Table &3: Referential integrity violated |
| 297 | Incorrect GUID in table &3 |
| 298 | A duplicate key exists in table &3 |
| 299 | Table &3: Referential integrity violated |
| 300 | Optimizer: Input data inconsistent |
| 301 | Writing data again; attempt number: &1 |
| 400 | Penalty costs for non-delivery too low |
| 401 | Product &1 in location &2: Non-delivery penalty costs too low |
| 402 | Penalty costs for safety stock shortfall are too low |
| 403 | Product &1 in location &2: Safety stock penalty costs too low |
| 404 | Shortfall quantities due to suboptimal solution |
| 405 | Safety stock shortfall due to suboptimal solution |
| 406 | No explanations necessary |
| 407 | Capacity analysis: Priority &1 |
| 408 | Upper Limit Analysis: Priority &1 |
| 409 | Product availability analysis: Priority &1 |
| 410 | Lead time analysis: Priority &1 |
| 411 | Cost analysis: Priority &1 |
| 412 | Suboptimality Analysis: Priority &1 |
| 413 | Missing quantities could not be fully explained |
| 414 | Missing quantites could be fully explained |
| 415 | Upper Limit Analysis |
| 416 | Capacity Analysis |
| 417 | Product Availability Analysis |
| 418 | Lead Time Analysis |
| 419 | Shortfall of safety stock not fully explainable |
| 420 | Shortfall of safety stock fully explainable |
| 421 | CPU time limit reached |
| 422 | No explanation found |
| 423 | Penalty costs analysis |
| 424 | Missing Quantity After Limit Analysis: &1% |
| 425 | Safety Stock Shortfall After Limit Analysis: &1% |
| 426 | Missing Quantity After Capacity Analysis: &1% |
| 427 | Safety Stock Shortfall After Capacity Analysis: &1% |
| 428 | Missing Quantity After Product Availability Analysis: &1% |
| 429 | Safety Stock Shortfall After Product Availability Analysis: &1% |
| 430 | Missing Quantity After Lead Time Analysis (Horizons): &1% |
| 431 | Safety Stock Shortfall After Lead Time Analysis (Horizons): &1% |
| 432 | Missing Quantity After Lead Time Analysis (Past): &1% |
| 433 | Safety Stock Shortfall After Lead Time Analysis (Past): &1% |
| 434 | Missing Quantity After Cost Analysis: &1% |
| 435 | Safety Stock Shortfall After Cost Analysis: &1% |
| 444 | Overflow caused by a too large amount of results data |
| 445 | Overflow caused by a too large amount of results data |
| 450 | Overload at storage resource &1 |
| 451 | Surplus of product &1 at location &2 |
| 452 | Stock of product &1 at location &2 above soft upper bound |
| 600 | Optimizer: Internal error occurred |
| 777 | Available memory on optimization server is low (available: &1%) |
| 801 | Starting optimization run |
| 802 | Loading parameters |
| 803 | Loading planning data |
| 804 | Checking data consistency |
| 805 | Starting time decomposition |
| 806 | Starting product decomposition |
| 807 | Extracting part of problem |
| 808 | Starting primal simplex algorithm |
| 809 | Starting dual simplex algorithm |
| 810 | Starting interior point method |
| 811 | Writing results |
| 812 | Completing optimization run |
| 813 | Starting partial search |
| 814 | Starting full search |
| 815 | Select optimization parameters |
| 816 | Solution found |
| 817 | Improving solution |
| 818 | Find start solution |
| 819 | End of calculation |
| 820 | Starting resource decomposition |
| 821 | Starting Automatic Cost Generation |
| 822 | Starting preallocation for product decomposition |
| 823 | Finished preallocation for product decomposition |
| 824 | Starting next loop of product decomposition |
| 825 | Finished product decomposition |
| 826 | Finished time decomposition |
| 827 | Finished resource decomposition |
| 828 | Starting priority decomposition |
| 829 | Finished priority decomposition |