/SAPAPO/SYP_HLTH_CHK -
The following messages are stored in message class /SAPAPO/SYP_HLTH_CHK: .
It is part of development package /SAPAPO/SYP in software component SCM-APO-PPS. This development package consists of objects that can be grouped under "Synchronized Production Planning".
It is part of development package /SAPAPO/SYP in software component SCM-APO-PPS. This development package consists of objects that can be grouped under "Synchronized Production Planning".
Message Nr ▲ | Message Text |
|---|---|
| 000 | Don't use Advanced Planning in combination with PPIM 0 |
| 001 | Activate location material with a PPIM other than 0 for Advanced Planning |
| 002 | Don't use PPIM 1 for externally procured location materials |
| 003 | Don't define a planning time fence in combination with PPIM 1 |
| 004 | Define the DPS horizon greater than the planning time fence |
| 005 | Set planning time fence equal to production freeze horizon for PPIM 3 |
| 006 | Don't set the plan deletion horizon in combination with PPIM 1 or 3 |
| 007 | Select a manual planning procedure for PPIM 1 |
| 008 | Define a planning group for PPIM 1 |
| 009 | Define only one production data structure of type S and P each |
| 010 | Clean up stock orders for location material with PPIM 9 |
| 011 | The order types in classic PP and Advanced Planning (PP/DS) do not match |
| 012 | Location materials with PPIM 0 do not support external planned orders |
| 013 | Planned order does not have a DPS handover time |
| 014 | DPS handover time of planned order is more than one day in the past |
| 015 | Stock order is beyond the DPS horzion |
| 016 | No data found for the current selection criteria |
| 017 | Check the status of the Supply Chain Integration Add-on for SAP IBP |
| 018 | Advanced planning scope and PPIM of location material cannot be combined |
| 019 | Your authorization is not sufficient |