/SAPAPO/SYP_HLTH_CHK -

The following messages are stored in message class /SAPAPO/SYP_HLTH_CHK: .
It is part of development package /SAPAPO/SYP in software component SCM-APO-PPS. This development package consists of objects that can be grouped under "Synchronized Production Planning".
Message Nr
Message Text
000Don't use Advanced Planning in combination with PPIM 0
001Activate location material with a PPIM other than 0 for Advanced Planning
002Don't use PPIM 1 for externally procured location materials
003Don't define a planning time fence in combination with PPIM 1
004Define the DPS horizon greater than the planning time fence
005Set planning time fence equal to production freeze horizon for PPIM 3
006Don't set the plan deletion horizon in combination with PPIM 1 or 3
007Select a manual planning procedure for PPIM 1
008Define a planning group for PPIM 1
009Define only one production data structure of type S and P each
010Clean up stock orders for location material with PPIM 9
011The order types in classic PP and Advanced Planning (PP/DS) do not match
012Location materials with PPIM 0 do not support external planned orders
013Planned order does not have a DPS handover time
014DPS handover time of planned order is more than one day in the past
015Stock order is beyond the DPS horzion
016No data found for the current selection criteria
017Check the status of the Supply Chain Integration Add-on for SAP IBP
018Advanced planning scope and PPIM of location material cannot be combined
019Your authorization is not sufficient
Privacy Policy