/SCMTMS/GNT_PLN - Interactive Gantt Chart
The following messages are stored in message class /SCMTMS/GNT_PLN: Interactive Gantt Chart.
It is part of development package /SCMTMS/GNT_PLN in software component TM-PLN-GNT. This development package consists of objects that can be grouped under "Backend planning functions for Gantt Chart".
It is part of development package /SCMTMS/GNT_PLN in software component TM-PLN-GNT. This development package consists of objects that can be grouped under "Backend planning functions for Gantt Chart".
Message Nr ▲ | Message Text |
|---|---|
| 001 | Document &1 assigned to resource &2 |
| 002 | Error occured on frontend: &1 |
| 003 | Can't cancel resource/equi type assignment; status of document &1 is "&2" |
| 004 | Reassignment not possible; only reassign one activity at a time |
| 005 | Coupling not possible; only reassign loading and travel activities |
| 006 | Reassignment not possible; reassign travel act. only within a document |
| 007 | Reassignment not possible; only reassign one document at a time |
| 008 | Reassignment not possible; invalid drop activity |
| 009 | Reassignment not possible; only reassign one document type at a time |
| 010 | Document &1 cannot be deleted |
| 011 | Resource or equipment type &1 cannot be deleted |
| 012 | Reassignment not possible; invalid drop position |
| 013 | Document &1 cannot be deleted, status is "&2" |
| 015 | Manual plan strategy &1 incompatible with Gantt chart; time not updated |
| 020 | Scheduling not possible for selected documents, resources and equi. types |
| 021 | Scheduling not possible; no doc. assigned to selected res./equi. types |
| 025 | Can't solve driver missing stage via context menu, use assignment instead |
| 030 | Stage between &1 and &2 missing |
| 031 | Stage between &1 and downtime at location &2 missing |
| 032 | Stage between downtime at location &1 and &2 missing |
| 033 | Stage between downtime at location &1 and downtime at location &2 missing |