/SCMTMS/VSS_CHK - Messages for VSS checks (technical)
The following messages are stored in message class /SCMTMS/VSS_CHK: Messages for VSS checks (technical).
It is part of development package /SCMTMS/PLN_VSS_AUNIT in software component TM-PLN-MP. This development package consists of objects that can be grouped under "Unittest Utilities for Scheduling - No Translation".
It is part of development package /SCMTMS/PLN_VSS_AUNIT in software component TM-PLN-MP. This development package consists of objects that can be grouped under "Unittest Utilities for Scheduling - No Translation".
Message Nr ▲ | Message Text |
|---|---|
| 000 | |
| 001 | Activity &1 of document &2 (ACT-KEY &3) start time is after end time |
| 002 | Activity &1 (ACT-KEY &2) starts before preceding &3 (KEY &4) is finished |
| 003 | Loading times of req. stop &1 (KEY &2) and req. stop &3 (KEY &4) overlap |
| 004 | Aggregated loading time of stop &1 (KEY &2) is wrong |
| 005 | Loading times of document &1 and &2 are not the same at location &3 |
| 006 | Coupling of document &1 at loc. &2 (KEY &3) start time is after end time |
| 007 | Coupling of document &1 at loc. &2 (KEY &3) starts before load finished |
| 008 | Document &1 unload at loc. &2 (KEY &3) starts before uncouple finished |
| 009 | Wrong duration for &1 at loc. &2. Expected duration &3 is currently &4 |
| 010 | Overlap on resource. Document &1 (KEY &2) overlaps with doc. &3 (&4) |
| 011 | Preparation of doc. &1 at loc. &2 (KEY &3) start time is after end time |
| 012 | Finalization of doc. &1 at loc. &2 (KEY &3) start time is after end time |
| 013 | Prep. of doc. &1 at loc. &2 (&3) is unfinished before next act. starts |
| 014 | Finalize of doc. &1 at loc. &2 (&3) starts before prev. act. finishes |
| 015 | Sequence of Capacity Doc. &1 and Capacity Doc. &2 is incorrect |
| 016 | Wrong Start Time for &1 (KEY &2). Expected Start Time &3 is currently &4 |
| 017 | Wrong End Time for &1 (KEY &2). Expected End Time &3 is currently &4 |
| 018 | Activity &1 (KEY &2) begins before expected time period starts (&3 < &4) |
| 019 | Activity &1 (KEY &2) ends after expected time period end (&3 > &4) |
| 020 | Stop of doc. &1 at &2 with coll/distr stops (KEY &3) has wrong times: &4 |
| 021 | Activity &1 of document &2 (KEY &3) is not in planning horizon |
| 022 | Downtime from &2 to &3 is not respected by activity &1 |
| 023 | Loading times of child doc. &1 are different to those of parent doc. &2 |
| 024 | Handl. res. or consumption not as expected (stop &1; &2 not equal to &3) |
| 025 | Loading times are missing for stop of &1 at &2 (KEY &3) |