BLPK - Document log header
Document log header information is stored in SAP table BLPK.
It is part of development package MD03 in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Devt ERP MPS/Deterministic Requirements Planning".
It is part of development package MD03 in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Devt ERP MPS/Deterministic Requirements Planning".
Fields for table BLPK
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | Client | X | MANDT | CLNT | 6 | T000 |
PRTNR | Confirmation number | X | PRTNR | NUMC | 20 | |
MATNR | Material Number | MATNR | CHAR | 80 | MARA | |
WERKS | Plant | WERKS_D | CHAR | 8 | T001W | |
VERID | Production Version | VERID | CHAR | 8 | MKAL | |
DATUM | Created On | SA_ERDAT | DATS | 16 | ||
UZEIT | Time | UZEIT | TIMS | 12 | ||
REPTP | Production Type | REPTP | CHAR | 4 | ||
STORN | Reversal indicator | SA_STORN | CHAR | 2 | ||
AUFNR | Run schedule header number | SA_AUFNR | CHAR | 24 | SAFK | |
KDAUF | Sales and Distribution Document Number | VBELN | CHAR | 20 | ||
KDPOS | Item number of the SD document | POSNR | NUMC | 12 | ||
PKNUM | Control Cycle | PKNUM | CHAR | 14 | PKHD | |
PKPOS | Kanban Control Cycle Item | PKPOS | NUMC | 6 | ||
MENGE | Quantity | MENGE_D | QUAN | 7 | ||
BDENR | PDC Number (Specific ID for all PDC Systems) | SA_BDENR | CHAR | 24 | ||
VAART | Processing Type for Backflush | SA_VAART | CHAR | 8 | ||
UNAME | User Name | UNAME | CHAR | 24 | ||
USR01 | User group in backflushing | SA_USR01 | CHAR | 24 | ||
SCHIV | Shift number | SA_SHIFT | NUMC | 2 | ||
MEINH | Unit of Measure for Display | MEINH | UNIT | 6 | T006 | |
VORNE | Reporting point operation number | PZPNR | CHAR | 8 | ||
BUDAT | Posting Date in the Document | BUDAT | DATS | 16 | ||
WAKZH | Post goods issues in the background (worklist) | SA_WAKZH | CHAR | 2 | ||
FLKZH | Production activities in the background (worklist) | SA_FLKZH | CHAR | 2 | ||
KAPKZH | Capacity reduction in the background (worklist) | SA_KAPKZH | CHAR | 2 | ||
PLCNF | Indicator: Backflushing With Planned Order | SA_PLCNF | CHAR | 2 | ||
OBART | Object type for reference in document log - repetitive mfg | SA_OBART | CHAR | 2 | ||
OBNUM | Object reference: Document log - repetitive manufacturing | OBNUM | CHAR | 40 | ||
RSKZG | Ind.: Reservation or dependent requirements object | SA_RSKZG | CHAR | 2 | ||
RSNUM | Number of reservation/dependent requirements | RSNUM | NUMC | 20 | ||
PWERK | Planning Plant | WERKS_PL | CHAR | 8 | ||
ACHARG | Receiving Batch for Repetitive Manufacturing | SA_CHARG | CHAR | 20 | ||
.INCLUDE | /CWM/S_BLPK | 0 | ||||
/CWM/MENGE | Quantity in Parallel Unit of Measure | /CWM/MENGE | QUAN | 7 | ||
/CWM/MEINH | Parallel Unit of Measure | /CWM/MEINS | UNIT | 6 | * | |
AUFLD | Explosion Date for Bill of Material (BOM) | REM_AUFLD | DATS | 16 |