T438M - Control Parameter for MRP -Material Level-
Control Parameter for MRP -Material Level- information is stored in SAP table T438M.
It is part of development package MD0C in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Customizing R/3 Material Requirements Planning".
It is part of development package MD0C in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Customizing R/3 Material Requirements Planning".
Fields for table T438M
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
|---|---|---|---|---|---|---|
| MANDT | Client | X | MANDT | CLNT | 6 | T000 |
| WERKS | Plant | X | WERKS_D | CHAR | 8 | T001W |
| MTART | MRP Group | X | DISGR | CHAR | 8 | |
| BANER | Creation Indicator for Purchase Requisitions | BANER | CHAR | 2 | ||
| DISER | Creation Indicator for MRP Lists | DISER | CHAR | 2 | ||
| UMTHZ | Rescheduling horizon | UMTHZ | NUMC | 6 | ||
| FIXHZ | Planning Time Fence | FIXHZ | NUMC | 6 | ||
| PLAHZ | Planning horizon | PLAHZ | NUMC | 6 | ||
| SBDIS | Share of safety stock which can be used for planning | SBDIS | NUMC | 6 | ||
| LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | LIFKZ | CHAR | 2 | ||
| GTERM | Scheduling according to purchasing info record or agreement | GTERM | CHAR | 2 | ||
| KZDRB | Indicator: direct procurement/production MRP | KZDRB | CHAR | 2 | ||
| XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | XFAT1 | CHAR | 2 | ||
| XFAT2 | Fant. 2 | XFAT2 | CHAR | 2 | ||
| VWVOR | Tolerance value for bringing forward receipt elements | VWVOR | NUMC | 4 | ||
| VWVER | Tolerance value for displacement in the future | VWVER | NUMC | 4 | ||
| PRREG | Checking rule for the availability check | PRREG | CHAR | 4 | T441R | |
| VRMOD | Consumption mode | VRMOD | CHAR | 2 | ||
| VINT1 | Consumption period: backward | VINT1 | NUMC | 6 | ||
| VINT2 | Consumption period: forward | VINT2 | NUMC | 6 | ||
| STRGR | Planning Strategy Group | STRGR | CHAR | 4 | T461P | |
| RESHZ | Roll forward period for the master plan | RESHZ | DEC | 2 | ||
| ANDIS | Number of Days After Which the Material Must Be Planned | ANDIS | INT2 | 2 | ||
| AUART | Order Type | AUFART | CHAR | 8 | T003O | |
| AUAR2 | Order type for process order | AUAR2 | CHAR | 8 | T003O | |
| PLSEL | Issue Storage Location Selection | PLSEL | CHAR | 2 | ||
| RVPKZ | Adjustment of Planned Independent Requirements | RVPKZ | CHAR | 2 | ||
| RESVP | Period of adjustment for planned independent requirements | RESVP | DEC | 2 | ||
| SHFLG | Safety time indicator (with or without safety time) | SHFLG | CHAR | 2 | ||
| SHZET | Safety Time (in Workdays) | SHZET | NUMC | 4 | ||
| MDACH | Action Control: Planned Order Processing | MDACH | CHAR | 4 | T46AC | |
| PRASTA | Period split | PRASTA | CHAR | 10 | T459S | |
| EXSGT | Do not explode bulk material items | EXSGD | CHAR | 2 | ||
| BESAL | Determination of explosion date for BOM and routing | BESAD | CHAR | 2 | ||
| BSART | MRP:doc.type purchase requisitions for standard purchase ord | BBSRT_NB | CHAR | 8 | T161 | |
| BARTL | MRP: Document type purchase requisition for subcontracting | BBSRT_LB | CHAR | 8 | T161 | |
| BARTU | MRP: purchase requisition for stock transfer - document type | BBSRT_UL | CHAR | 8 | T161 | |
| GRREL | Relevant for requirements grouping for project stock | GRREL | CHAR | 2 | ||
| VERTR | Start date of order proposals allowed in the past | VERGR | CHAR | 2 | ||
| FKOBS | ATP check by full confirmation logic | FKOBS | CHAR | 2 | ||
| EVAPR | Evaluation Profile for Range-of-Coverage Data | MD_EVAPR | CHAR | 6 | T465 | |
| PREQAPPROVAL | Purchase Requisition Handover to Purchasing Required | PREQAPPROVAL | CHAR | 2 |