T439A - MRP Lot Sizes
MRP Lot Sizes information is stored in SAP table T439A.
It is part of development package MD0C in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Customizing R/3 Material Requirements Planning".
It is part of development package MD0C in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Customizing R/3 Material Requirements Planning".
Fields for table T439A
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
|---|---|---|---|---|---|---|
| MANDT | Client | X | MANDT | CLNT | 6 | |
| DISLS | Lot Sizing Procedure within Materials Planning | X | DISLS | CHAR | 4 | |
| LOSVF | Lot-sizing procedure for short-term period | LOSVF | CHAR | 2 | ||
| LOSKZ | Lot-size indicator for the short-term period | LOSKZ | CHAR | 2 | ||
| PERAZ | Number of Periods for the Short-Term Area | PERAZ | DEC | 2 | ||
| TERBV | Scheduling for period lot sizes in short-term area | TERBV | CHAR | 2 | ||
| UELAP | Overlap scheduling in the short-term area | UELAP | CHAR | 2 | ||
| KFPKZ | Period indicator for calculating long-term planning | KFPKZ | CHAR | 2 | ||
| KFPAZ | Number of periods for long-term lot size | KFPAZ | DEC | 2 | ||
| LGLVF | Lot-sizing procedure for long-term lot-sizing | LGLVF | CHAR | 2 | ||
| LGLKZ | Lot-size indicator for long-term lot-sizing procedure | LGLKZ | CHAR | 2 | ||
| LGPAZ | Number of periods for long-term lot size | LGPAZ | DEC | 2 | ||
| LGTER | Scheduling the long-term period lot-sizing procedure | LGTER | CHAR | 2 | ||
| LGUEL | Overlapping indiactor for long-term lot sizing | LGUEL | CHAR | 2 | ||
| LGMIN | Check minimum lot size | CHMIN | CHAR | 2 | ||
| LGMAX | Check maximum lot size | CHMAX | CHAR | 2 | ||
| KZSPL | Indicator: Splitting quota in short-term horizon | KZSPL | CHAR | 2 | ||
| LGSPL | Indicator: splitting quota in the long-term horizon | LGSPL | CHAR | 2 | ||
| INTKA | Interpretation of the planning calendar events | INTKA | CHAR | 2 | ||
| LGINT | Iterpretation of MRP dates: long-term planning | LGINT | CHAR | 2 | ||
| LGKND | Lot-size calculation in make-to-order production | LGKND | CHAR | 2 | ||
| KZHOR | Horizon for lot-for-lot order qty | KZHOR | NUMC | 6 | ||
| HBVAR | Maximum stock level variant | HBVAR | CHAR | 2 | ||
| LASTL | Last lot exact | LASTL | CHAR | 2 | ||
| UNTKZ | Underdelivery Tolerance | UNTKZ | CHAR | 2 |