TCX00 - Scheduling: Planning Levels and Control Parameters

Scheduling: Planning Levels and Control Parameters information is stored in SAP table TCX00.
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".

Fields for table TCX00

Field Name
Description
Is Key
Data Element
Data Type
Length
Check Table
MANDTClientXMANDTCLNT6T000
WERKSPlantXWERKS_DCHAR8T001W
AUFTGOrder group for capacity planningXAUFTGCHAR4
AUFTAOrder type in capacity planningXAUFTACHAR8
VAGRPProduction SupervisorXFEVORCHAR6T024F
PHORIScheduling horizon (detailed planning)PHORINUMC6
APLS1Selection ID (detailed planning)APLS1CHAR4TCA43
TERM1Lead time scheduling (detailed planning)TERMXCHAR2
KAPK1Indicator: Generate capacity reqmts (detailed planning)KAPKXCHAR2
PHORI_2Scheduling horizon (detailed planning, medium term)PHORI_2NUMC6
APLS1_2Selection ID for routing (detailed planning, medium term)APLS1_2CHAR4
TERM1_2Lead time scheduling (detailed planning, medium term)TERMX_2CHAR2
KAPK1_2Create capacity requirements (detailed planning,medium term)KAPKX_2CHAR2
PHORI_3Scheduling horizon (detailed planning, long term)PHORI_3NUMC6
APLS1_3Selection ID for routing (detailed planning, long term)APLS1_3CHAR4
KAPK1_3Create capacity requirements (detailed planning, long term)KAPKX_3CHAR2
TERM1_3Lead time scheduling (detailed planning, long term)TERMX_3CHAR2
LINE_TERMTakt time-/rate-based scheduling of planned orderLINE_TERMCHAR2
RATHR-INVALID FOR S/4- Rate-based planning horizonRATHRNUMC6
APLS2-INVALID FOR S/4- Selection ID (rate-based planning)APLS2CHAR4TCA43
TERM2-INVALID FOR S/4- Lead time scheduling (rate-based planning)TERMX_RATECHAR2
KAPK2-INVALID FOR S/4- Create cap. rqmts (rate-based planning)KAPKX_RATECHAR2
GROHRRough-cut planning horizonGROHRNUMC6
APLS3Selection ID (rough-cut planning)APLS3CHAR4TCA43
TERM3Lead time scheduling (rough-cut planning)TERMX_GROBCHAR2
KAPK3Create cap. rqmts (rough-cut planning)KAPKX_GROBCHAR2
DADJ1Scheduling level for adjusting basic datesDADJ1CHAR2
DADJ2Adjust dates in lead time schedulingDADJ2CHAR2
DADJ3Adjusting dates when dispatching planned ordersDADJ3CHAR2
TERMKZScheduling typeTERMKZCHAR2T482
TERM_AUTOIndicator: Calculate dates automatically during savingTERM_AUTOCHAR2
PROT_AUTODisplay scheduling log automaticallyPROT_AUTOCHAR2
STVERGMaximum number of days start date can be in the pastSTVERGNUMC6
MATFRUEHLatest date for material stagingLAGE_FRCHAR2
BREAKSIndicator: Scheduling allowing for breaksBREAKSCHAR2
PROD_DATESScheduling based on production datesPROD_DATESCHAR2
AUF_SHIFTIndicator: Shift order/networkAUF_SHIFTCHAR2
REDST_MAXMaximum reduction levelREDST_MAXNUMC2
RED_ARTReduction TypeRED_ARTCHAR2
REDVS_S1Reduction of Floats Before and After Production (%)REDVS_S1DEC2
REDVS_S2Reduction level 2: Red. of floats bef./after prod. (in %)REDVS_S2DEC2
REDVS_S3Reduction level 3: Red. of floats bef./aft. prod. (in %)REDVS_S3DEC2
REDVS_S4Reduction level 4: Red. of floats bef./aft. prod. (in %)REDVS_S4DEC2
REDVS_S5Reduction level 5: Red. of floats bef./aft. prod. (in %)REDVS_S5DEC2
REDVS_S6Reduction level 6: Red. of floats bef./aft. prod. (in %)REDVS_S6DEC2
TERM_KPERRescheduling in Workforce PlanningTERM_KPERCHAR2
CMACTAssignment Material Staging Operation SegmentCMACTCHAR2
Privacy Policy