TCY37 - Strategy profile for capacity leveling
Strategy profile for capacity leveling information is stored in SAP table TCY37.
It is part of development package CY01 in software component PP-CRP-LVL. This development package consists of objects that can be grouped under "Application Development ERP Resource Planning".
It is part of development package CY01 in software component PP-CRP-LVL. This development package consists of objects that can be grouped under "Application Development ERP Resource Planning".
Fields for table TCY37
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | Client | X | MANDT | CLNT | 3 | T000 |
STPRO_ID | Strategy profile for capacity leveling | X | CY_STPRO | CHAR | 10 | |
.INCLUDE | CYCRPSTPRO | 0 | ||||
FORWARD | Plan. direction forwards | FORWARD | CHAR | 1 | ||
CAPSCHED | Finite scheduling | CAPSCHED | CHAR | 1 | ||
AUTOMATAV | Enter date and work center when dispatching | AUTOMATAV | CHAR | 1 | ||
AUTOAUFKT | Period split when dispatching | AUTOAUFKT | CHAR | 1 | ||
AUTOAUFDT | Reschedule with production versions | AUTOAUFDT | CHAR | 1 | ||
EIGENB_DIS | Date determination for dispatching of internal production | CY_EIGBDIS | NUMC | 1 | ||
EARLIEST | Dispatch at earliest point in time | CY_EARLIES | CHAR | 1 | ||
CANCEL_DIS | Cancel dispatching due to error | CY_CANCDIS | CHAR | 1 | ||
QUEUETIME | Treatment of queue time on dispatching | CY_QUEUETI | NUMC | 1 | ||
RED_LEVEL | Reduction level of queue time | CY_REDLEV | NUMC | 1 | ||
DISSORT | Key for determining dispatching sequence | CY_DISSORT | CHAR | 10 | * | |
ATPCAP | Take capacity load in planning period into account | CY_ATPCAP | CHAR | 1 | ||
BUFONLY | Use operation floats | CY_BUFONLY | CHAR | 1 | ||
USEFLOATB | Use float before production in finite scheduling | CY_UFLOATB | CHAR | 1 | ||
USEFLOATA | Use float after production in finite scheduling | CY_UFLOATA | CHAR | 1 | ||
INSERTOPR | Insert operation | CY_INSOPR | CHAR | 1 | ||
CLOSEGAP | Close gaps when deallocating operations | CY_CLOSGAP | NUMC | 1 | ||
ASS_DISP | Indicator: Simultaneous allocation and dispatching | CY_ASSDISP | CHAR | 1 | ||
BUCKET | Period split for dispatching | CY_BUCKETU | NUMC | 1 | ||
BUCKET1 | Start of search in planning direction | CY_BUCKET1 | CHAR | 1 | ||
BUCKETBEG | Operations start or finish on point in period split | CY_BUCKETB | CHAR | 1 | ||
BUCKETFULL | Operation must lie entirely within a period split | CY_BUCKETF | CHAR | 1 | ||
NOBREAKS | Planning in non-work periods | CY_NOBREAK | CHAR | 1 | ||
DIRCHANGE | Change planning direction | CY_DIRCHAN | CHAR | 1 | ||
CANCEL_VER | Terminate dispatching when rescheduling with prod.versions | CY_CANCVER | CHAR | 1 | ||
DISWSETUP | Dispatch at best time for setup | CY_DISWSTP | CHAR | 1 | ||
INIT_COND | Initial setup state | CY_INITIAL | CHAR | 3 |