/SAPAPO/SNPOPIAM - SNP Optimizer: Material Flow on Arcs (ET_ARCMAT)
SNP Optimizer: Material Flow on Arcs (ET_ARCMAT) information is stored in SAP table /SAPAPO/SNPOPIAM.
It is part of development package /SAPAPO/MSDP in software component SCM-APO-SNP. This development package consists of objects that can be grouped under "Application Development Supply & Demand Planner".
It is part of development package /SAPAPO/MSDP in software component SCM-APO-SNP. This development package consists of objects that can be grouped under "Application Development Supply & Demand Planner".
Fields for table /SAPAPO/SNPOPIAM
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | Client (APO Conversion to Client-Dependency) | X | /SAPAPO/CLNTAPO_MANDT | CLNT | 6 | |
SESSIONID | Supply Network Planning: Optimizer session GUID | X | /SAPAPO/SNPSESSION | CHAR | 44 | /SAPAPO/SNPOPRUN |
LINE_NO | Row Number | X | /SAPAPO/SNPOPT_LINE_NO | NUMC | 20 | |
.INCLUDE | /SAPAPO/DRP_OPTIN_ARCMAT | 0 | ||||
ARCID | Any GUID, Independent of Object | /SAPAPO/GUID | CHAR | 44 | ||
MATID | Internal Number (UID) for Product | /SAPAPO/MATID | CHAR | 44 | ||
VALTO | Optimizer: End Time in Days | /SAPAPO/SNPVALTO | INT4 | 4 | ||
VALFR | Optimizer: Start Time in Days | /SAPAPO/SNPVALFR | INT4 | 4 | ||
MINLO | SNP: Minimum number of lots | /SAPAPO/SNPMINLO | FLTP | 8 | ||
MAXLO | SNP: Maximum number of lots | /SAPAPO/SNPMAXLO | FLTP | 8 | ||
MAXFL | SNP Opt.: Maximum Number of lots active? | /SAPAPO/MSDP_OPT_MAXFL4_FLAG | CHAR | 2 | ||
TRVOL | SNP: Transportation lot size in product units | /SAPAPO/SNPTRVOL | FLTP | 8 | ||
TCONA | SNP: Consumption of Transport Capacity (Dimension A) | /SAPAPO/SNPTCONA | FLTP | 8 | ||
TCONB | SNP: Consumption of Transport Capacity (Dimension B) | /SAPAPO/SNPTCONB | FLTP | 8 | ||
TCONC | SNP: Consumption of Transport Capacity (Dimension C) | /SAPAPO/SNPTCONC | FLTP | 8 | ||
TCOST | SNP: Transport Costs (per Mat. Basis Quantities) | /SAPAPO/SNPTCOST | FLTP | 8 | ||
SUBCO | Indicator for Subcontracting (initial, X) | /SAPAPO/TR_SUBCO | CHAR | 2 | ||
TPRIO | SNP Optimizer: Priority | /SAPAPO/SNPOPTPRIO | FLTP | 8 | ||
HORTO | Optimizer: End Date/Time of Horizon, Measured as Time Bucket | /SAPAPO/SNPHORTO | INT4 | 4 | ||
RECTI | SNP: Goods Receipt Processing Time | /SAPAPO/SNPRECTI | INT4 | 4 |