CY - Capacity Requirements Planning
The following messages are stored in message class CY: Capacity Requirements Planning.
It is part of development package CY in software component PP-CRP-ALY. This development package consists of objects that can be grouped under "R/3 Application development: Capacity Planning".
It is part of development package CY in software component PP-CRP-ALY. This development package consists of objects that can be grouped under "R/3 Application development: Capacity Planning".
Message Nr ▲ | Message Text |
---|---|
000 | ---------------------------------------------------------------* |
001 | Standard errors * |
002 | *--------------------------------------------------------------* |
003 | Error when converting a factory calendar day into a date |
004 | Error when converting a date into a factory calendar day |
006 | Incorrect date format |
009 | Error when assigning a number to the capacity requirements |
010 | Number & for capacity requirements & lies in the critical area |
011 | Assign highest number & for capacity requirement & |
015 | Error when inserting in table &1: Of &2 records &3 records were posted |
016 | Error during update in table &1: Of &2 records &3 records were posted |
017 | Error when determining the posting period |
018 | Error when determining the calendar week |
019 | Error when determining the first day in a calendar week |
020 | Error in date format for start date of evaluations |
021 | Error in date format for finish date of evaluations |
022 | Error in date format for dispatching of backlog |
023 | Error when calculating the evaluation period |
024 | Error when calculating the data base reading period |
025 | Error when calculating the evaluation period |
026 | Name of evaluation already exists |
027 | The name & is reserved for system purposes |
028 | Please select an evaluation |
029 | There are no evaluations |
030 | Data cannot be written to data base |
031 | The background job cannot be generated |
032 | The background job cannot be started |
033 | Error when reading data base |
034 | Administrative data cannot be read |
035 | Error writing to the database |
036 | Error when writing administrative data to data base |
050 | You cannot use the operator BT |
051 | The operator & does not exist |
053 | The upper limit of the range is lower than the lower limit |
055 | The entry & does not have a correct date format |
056 | The date & does not exist |
090 | The planning table is already active. Recursive calling up is not allowed |
097 | Available capacity |
098 | Operation & & was changed |
099 | ---------------------------------------------------------------* |
100 | * Errors in capacity planning * |
101 | ---------------------------------------------------------------* |
102 | The system could not read any data from the data base |
103 | Various units are added together |
104 | Please select only one version for the period display |
105 | Please select a version for the period display |
106 | Please enter a start and a finish date for the time interval |
107 | Selection criteria are missing |
108 | You must choose at least one order category |
109 | Only the scheduling level "detailed" is valid at present for work orders |
110 | There is no setup and no teardown at work center & |
111 | The object has no capacity requirements |
112 | The objects can not be displayed together |
113 | Please enter a valid distribution key |
114 | The std. profile & was not found when the transaction was started |
115 | Please assign a valid overall profile to the parameter & |
116 | You cannot use the period type "factory calendar day" |
117 | You cannot use the period type "posting period" |
118 | You cannot enter factory calendar days or posting periods |
119 | Please enter a start date that is before the finish date |
120 | Please select at least one work center |
121 | Please enter the posting period using the format "YYYYPPP" |
122 | There are no work centers that match the entered selection criteria |
123 | Please enter a unique sort sequence |
124 | The graphic can be generated for a maximum of 32 work centers/capacities |
125 | Please select a time unit for the display of the capacity |
126 | Please select at least one period |
127 | Please select a work center |
128 | Please select only one work center |
129 | Only capacity requirements from & to & can be displayed |
130 | Please select at least one set of dates (earliest, latest) |
131 | Please enter a unique sort sequence |
132 | Please position the cursor on the part of the screen containing data |
133 | You should enter a unit for the standard value. |
134 | Select at least one line |
135 | The object & can not be determined unambiguously |
136 | There is no special dispatching function available for you. |
137 | No objects have been selected. Function not possible |
138 | In the evaluation period no labor has been assigned to the capacity |
139 | Order & has no requirements in the eval. period, so there is no display |
140 | No capacity requirements were found in the evaluation period |
141 | The orders entered do not exist |
142 | Please specify a continuous sequence for sorting |
143 | Please specify selection criteria first |
144 | There are no capacity requirements for the current selection and settings |
145 | No capacity requirements have been found for the selected periods |
146 | Please enter the name of a hierarchy and the corresponding plant |
147 | The graphic can be generated for a maximum of 32 orders |
148 | The graphic can be generated for a maximum of 32 periods |
149 | The selected value has no capacity requirements |
150 | Please maintain set & in combination & first |
151 | Since there is no data, the file will not be created on your PC |
152 | Please select only one version of the capacity detail list |
153 | Please select only one type of graphic |
154 | An error occured when file & on your PC was opened |
155 | An error occurred when data was written to file & on your PC |
156 | An error occurred when data was transferred to file & on your PC |
157 | File & has been created on your PC |
158 | The data transfer is only possible to a PC |
159 | The work centers entered have no capacities |
160 | & & does not exist |
161 | The work centers entered do not exist or have no capacity |
162 | The entered PC file name is not correct |
163 | The entered PC file name for the standard overview is not correct |
164 | The entered PC file name for the detailed cap. list is not correct |
165 | The entered PC file name for the variable overview is not correct |
166 | The entered PC path name is not correct |
167 | & & does not exist in plant & |
168 | Please enter criteria for the work center selection first |
169 | The flow control of the transaction cannot be initialized |
170 | Error when determining the period for a date |
171 | No distribution key has been maintained for capacity category & |
172 | Please select one selection profile |
173 | Please select one option profile |
174 | Please select one overall profile |
175 | Please select only one graphics profile |
176 | Please select one list profile |
177 | Please select one combination |
178 | Please select one version of the variable overview |
179 | When the DB table & was read, the max. no. of & records was reached |
180 | The hierarchy & does not exist in plant & |
181 | Plant & does not exist |
182 | No scheduling was carried out for the production quantities entered |
183 | Specify a plant for the hierarchy & |
184 | There are no operations for the selected work center |
185 | Version & of the detailed list does not exist |
186 | The set for the initial screen does not exist |
187 | The set for the selection of the capacity categories does not exist |
188 | The set for the selection of the work centers does not exist |
189 | The set for the selection of the orders does not exist |
190 | Set & does not exist. Please press PF1 for more information. |
191 | There are no orders for the selected work centers and options |
192 | There is no pool for the selected work centers and options |
193 | There is no backlog for the selected work centers and options |
194 | There is no overload for the selected work centers and options |
195 | There are no requirements for the selected orders and options |
196 | Set & not found |
197 | You cannot refer to the column which you are presently defining |
198 | The column name does not exist |
199 | Definition of column & indirectly contains column & |
200 | Minimum load mayt not exceed maximum load |
201 | Table entries delivered by SAP may not be deleted |
202 | Period types F, G, H are not currently supported in capacity planning |
203 | Select another period type |
204 | Select a PP planning calendar |
205 | The planning calendar & was not found in plant & |
206 | The order does not fulfill the selection criteria so there is no display |
207 | The number of data records to be displayed is greater than 1024 |
208 | Factor & of & does not lie in the permitted value interval |
209 | Maintenance tasks cannot be changed on the planning table |
210 | Production orders cannot be changed |
211 | Overall profile &1: Control profile must contain presentation form &2 |
212 | The requirement percentages must be either equal or ascending |
213 | There must be at least one stored entry |
214 | No distribution has been defined for the function & |
217 | Specify the operator |
218 | Please enter an integral number |
219 | Please only enter one combination of sets per column name |
220 | You cannot maintain an operator for value category & |
221 | Value category 1B can only be used if there is already a value categ. 1A |
222 | Only when you enter the first value categ. 1A can you maint. an operator |
223 | For columns with the value cat. 4, only this entry can be defined |
224 | Please maintain the operator for the first entry of value category 1A |
225 | Please enter unique column assigments |
226 | Entries delivered by SAP cannot be changed |
227 | If you do not want to define the column, please also delete the name |
228 | If you do not want to define the version, please also delete the name |
229 | Please maintain value category and value first |
230 | Please enter the name of a hierarchy |
231 | Column & does not exist |
232 | Value cat. & does not exist |
233 | Variant & does not exist |
234 | The column heading is longer than the width of the column (will be split) |
235 | Planned orders do not have a status |
236 | The sequence of the columns must begin with 1 and not have any gaps |
237 | The maximum of & operations has been read |
238 | The maximum of & orders has been read |
239 | The maximum of & work centers has been read |
240 | The maximum number of & capacities has been read |
241 | The maximum number of & capacity requirements has been read |
242 | The maximum number of & planned orders has been read |
243 | You cannot enter a date in factory calendar days |
244 | You cannot enter a date in posting periods |
245 | The date does not correspond to the date type set |
246 | Maximum number of columns/versions has been reached. Enter new version. |
247 | You cannot enter completion confirmations. Only display possible |
248 | Planned orders cannot be confirmed. |
249 | Function not possible for planned orders |
250 | This function cannot be used with maintenance orders |
251 | This function cannot be used with networks |
252 | Conversion "&" to "&" not possible! (Center: "&", Cap. Category: "&") |
253 | Selected function cannot be carried out - cursor is not on relevant data |
254 | Table TCY09 converted successfully |
255 | Either select orders or planned orders |
256 | The planned orders entered do not exist |
257 | Planned order & has no rqmts. in the eval. period, so there is no display |
258 | Leveling functions cannot be executed for simulative planned orders |
259 | You should either select work centers or people |
260 | No orders are assigned to the WBS element, so no processing occurs |
261 | Either enter a material or a routing |
262 | Fully define a routing |
263 | Enter either a material, a routing or a sales order |
280 | No actual capacity requirements were found in the evaluation period |
294 | Internal error when updating the planning table: Refer to the long text |
295 | Function not possible for planned orders |
296 | Function not possible for SOP orders |
297 | The profile entered for the capacity availability check is not suitable |
298 | No reqmts/caps exists or not relevant to finite scheduling |
299 | The status selection profile & does not exist. (see long text) |
300 | First of all enter selection criteria |
301 | The selection criteria relate to more than one object type |
302 | The object set from selection profile contains no selection criteria |
303 | Object set and filter set contain the same selection criteria |
304 | There are no filter criteria available |
305 | The object set contains more than eight selection criteria with variables |
306 | The filter ser contains more than eight selection criteria with variables |
307 | Error when reading profile |
308 | The selection criteria do not relate to any available object type |
309 | Scheduling error or Term. data not complete. See protocol |
310 | The set & is not available (please see long text) |
311 | Presentation type and layout type do not belong together |
312 | The object set and filter set must be different. |
313 | Error in calculating period |
314 | Error in calculating date for dispatching backlog |
315 | The date for dispatching the backlog is outside the d.base reading period |
316 | The evaluation period is not within the database reading period |
317 | The entries for "factory calendar" and "posting periods are not valid |
318 | Enter a reduction level |
319 | Changes to the standard SAP profiles are not allowed |
320 | Splitting and allocation of phases is not permitted |
321 | Dispatching not permitted |
322 | Dispatching not possible |
323 | No authorization for dispatching |
324 | & &/&: Order can not be locked |
325 | & &/&: Error in setting status "dispatched" |
326 | Resetting the status "dispatched " not permitted |
327 | Resetting the status "dispatched" not possible |
328 | No authorization to reset status |
329 | Error in resetting the status "dispatched" |
330 | The evaluation profile & could not be read |
331 | The control profile & could not be read |
332 | The overall profile & could not be read |
333 | The period profile & could not be read |
334 | The selection profile & could not be read |
335 | The strategy profile & could not be read |
336 | The time profile & could not be read |
337 | You must enter a valid scheduling level |
338 | The operation & in order & has already been dispatched |
339 | Start date in the past |
340 | & &/&: Start date before actual finish date |
341 | & &/&: The operation has already been dispatched |
342 | Network &/&: The start date has a fixed branch info indicator |
343 | Network &/&: The start date is before the constraint date |
344 | Network &/&: The start date is after the constraint date |
345 | Network &/&: The finish date has a fixed branch info indicator |
346 | Network &/&: The finish date is before the constraint date |
347 | Network &/&: The finish date is after the constraint date |
348 | The work center & in plant & is locked |
349 | The work center & in plant & has a deletion flag |
350 | Order &/&: No start date given |
351 | The planning period does not lie within the database reading period |
352 | The planning period does not lie within the evaluation period |
353 | Listviewer or MS Windows are not correctly installed |
354 | List successfully exported into the listviewer |
355 | Target file for the list could not be opened |
356 | List could not be written in the file |
357 | The quantity of data selected is too large for the listviewer |
358 | There are still entries for flow control & |
359 | You should enter a CUA status for the change mode |
360 | The planning table profile & could not be read |
361 | The profile for the planning table (tabular form) could not be read |
362 | You should enter a CUA status for the display mode |
363 | No groups have been defined for the layout & |
364 | You should check whether you need a period profile |
365 | Enter a profile for the planning table (tabular form) |
366 | Enter a profile for the planning table |
367 | There is no scheduling log |
368 | Order &/operation &: Split & was deleted |
369 | The profile & has not yet been read |
370 | The list profile & could not be read |
371 | You should enter a list profile |
372 | Do not select splits that are to be deleted |
373 | The report can not be executed |
374 | Capacity category does not exist or cannot be selected |
375 | Initial view for capacity category & not found |
376 | Person not found |
377 | Enter a grouping and sort criteria |
378 | You should define the split completely |
379 | Planned order & / operation &: Requirements can not be split |
380 | No authorization for changes to order & |
381 | Order & could not be locked |
382 | You can only assign requirements from labor capacities to people |
383 | You should only assign rqmts. from non-labor caps to indiv. caps. |
384 | No objective given for the allocation |
385 | & is not an individual capacity |
386 | The object selected is not a split |
387 | The split has not been dispatched and can therefore not be deallocated |
388 | Status "Dispatched" can not be reversed |
389 | The GUI menu given for the change mode is not consistent |
390 | The GUI menu given for the display mode is not consistent |
391 | You have no authorization to make changes |
392 | No sort is maintained in layout & chart & |
393 | No grouping is maintained in layout & chart & |
394 | Planned order changed |
395 | Planned order logically deleted |
396 | Planned order not found |
397 | Planned order locked |
398 | Error when locking planned order |
399 | You should first enter a presentation type |
400 | Direct assignment of remaining split record not allowed |
401 | Capacity requirements can not be displayed |
402 | Operation is already dispatched |
403 | Split has not been assigned |
404 | The remaining split cannot be deleted |
405 | Operation was deallocated because of changes relevant to scheduling |
406 | The remaining split record cannot be dispatched |
407 | The split has already been dispatched |
408 | The status "dispatched" cannot be set |
409 | You cannot dispatch to the work center entered |
410 | The quantity of all the splits is greater than the operation quantity |
411 | The work of all the splits is greater than the work in the operation |
412 | The individual capacity does not belong to the capacity |
413 | The person belongs neither to the capacity not to the work center |
414 | You should select only one entry as the heading |
415 | The key is not a sort key |
416 | To transfer people, splits must be selected |
417 | A sort key must be entered for the group 0 |
418 | You should enter a sort layout key |
419 | You should either enter a group 0 or groups not equal to 0 |
420 | Phases cannot be dispatched or deallocated |
421 | The capacity requirements are already split |
422 | Person not valid at given point in time |
423 | Error when scheduling split & |
424 | The overall profile & is faulty |
425 | Overall profile & already exists in client &. Overwrite? |
426 | The name of the overall profile must start with Z. |
440 | Planned order & has no valid production versions |
441 | Invalid production version for planned order & |
442 | No planned orders with valid production versions exist |
443 | Planned order & was rescheduled using the next production version |
444 | Planned order & could not be rescheduled for the next line |
445 | Planned order &: Rescheduling with production version was rejected |
446 | Change production version on error was not executed |
450 | Planned order &1 operation &2 were deleted on rescheduling |
451 | Changes cannot be made to planned orders for planned independent reqmts |
452 | Changes cannot be made to directly produced planned orders |
497 | ***++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++*** |
498 | *** PERIOD PLANNING TABLE MESSAGES |
499 | ***++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++*** |
500 | Place the cursor on valid line or valid field |
501 | View & could not be blocked, please try later |
502 | Format key & already processed: Lock not possible |
503 | Layout key "&" was saved -> F1 |
504 | Format key & could not be saved |
505 | No group indicated as heading group in layout & chart & |
506 | Please choose a period for display of individual elements |
507 | Work center is not loaded in the planning table. Resched. not possible |
508 | Place the cursor on a requirements line or work center |
509 | No requirements elements have been selected |
510 | No period may be selected for dispatch- and deallocation functions |
511 | Planning results were saved |
512 | Planning period was exceeded |
513 | Please select requirements elements for distribution display |
514 | Planning period was exceeded |
515 | Place the cursor on a period or select a period |
516 | Structures of the layout key & could not be saved |
517 | Search string "&" not found |
518 | There are & messages. You should look at the log |
519 | Select a resource |
520 | No work centers or orders were found |
521 | Overall profile "&" was not found |
522 | Evaluation profile "&" was not found |
523 | Time profile "&" was not found |
524 | Period profile "&" was not found |
525 | Control profile "&" was not found |
526 | Planning table (tabular form) profile "&" was not found |
527 | Planning table profile "&" was not found |
528 | Strategy profile "&" was not found |
529 | Layout-ID has not been maintained in the planning table (tabular form) |
530 | Layout ID has not been maintained in the planning table |
531 | Display "&" in the control profile is unknown |
532 | Layout ID "&" has not been found |
533 | Maintain grouping for layout & |
534 | No structures defined in the layout key "&" |
535 | Program error: READ_WITH_INDEX for structure & index & not found |
536 | Display fields for layout key were not found : "&" |
537 | You must enter the layout- key and category as reference basis |
538 | The layout key "&" category "&" has already been defined |
539 | Layout key "&" was saved |
540 | No requirements in evaluation period were found |
541 | Fields not selected were sorted according to structure |
542 | Fields not selected were sorted according to key word |
543 | Layout key "&" was not found |
544 | Layout key "&" category "&" has not yet been maintained in language "&" |
545 | More than 999 resources were selected |
546 | Message log does not contain any messages |
547 | You should select only one resource for manual dispatching |
548 | The first period has already been reached |
549 | The last period has already been reached |
550 | Search string & was found |
551 | Planning results were not saved |
552 | Maintain layout key for layout & |
553 | View "&" can not be displayed |
554 | Enter the type of layout key |
555 | Sort key "&" not found |
558 | Only select one resource when dispatching or rescheduling |
559 | In graphical object type &1 object representation &2 is not maintained |
561 | PGM ERR: TCY31_H_TAB buffering "&" "&" "&" "&" not found |
563 | No sort found for layout ID "&" |
565 | Layout & chart & sort & group & not found |
566 | Layout & in profile & not fully maintained |
567 | Enter item number for sort key item |
568 | A negative available capacity has arisen |
569 | A negative capacity requirements have arisen |
570 | Sort fields for layout key & were not found |
571 | Layout key and field selection were deleted: & |
572 | Transport system does not allow any change: & & & & |
573 | Maximum number of selectable fields is &. |
574 | Select only one line |
575 | The function is only supported for "planning direction forwards". |
576 | The function is only supported with "Insert operation". |
596 | PGM ERR: & & & & |
597 | Structure & not supported |
598 | Requirements with no load in evaluation period not displayed |
599 | & & & & |
600 | No independent data exists. |
610 | > Function: & |
611 | Requirements group/-combination &/& & in chart/line & |
612 | & requirements groups generated, deleted or changed. |
613 | Individual group requirements & for group/combination &/& & |
614 | & individual group requirments, deleted or changed. |
615 | < function: & |
616 | Chart sorted |
617 | Select a chart |
640 | Profile for planning table was initialized |
641 | Profile for planning table & & was already converted or is new |
642 | Graphical object type selection & & not found. |
643 | Heading for table section in chart & not maintained |
644 | Graphical object type selection & not found |
645 | GANTT chart: Menu function & not known |
646 | Capacity requirements group/-combination &/&: function & triggered |
647 | Capacity requirements &: Function & triggered |
648 | GANTT chart: Function <Alive> triggered |
649 | GANTT chart: menu function & triggered |
650 | GANTT chart: function <Continue> triggered |
651 | Drop graphical object: start & &, finish & & |
652 | Drop graphical object: target chart/-line &/&, function & |
653 | Drag and drop graphical object: from & to & invalid |
654 | Drop graphical object: chart/line &/& invalid |
655 | GANTT chart: function <Cancel> triggered |
656 | GANTT chart: function <Exit> triggered |
657 | GANTT chart: function <Back> triggered |
658 | GANTT chart: function & not possible |
659 | Line representation selection: no representation selected |
660 | Line representation selection: & status & not valid |
661 | Table line & & invalid |
662 | Representation selection: no representation selected |
663 | Representation selection: & & status & does not exist |
664 | Representation selection & & not found |
665 | Object representation & has no graphical element types |
666 | Represenetation selection & incomplete |
667 | Profile planning table: &, no representation profile maintained |
668 | Chart & not known |
669 | Group/combination &/& not known |
670 | Graphical object selection: no object type selected |
671 | Graphical object type selection: status & does not exist |
672 | A data segment & & does not exist |
673 | Graphical object type & has not fields |
674 | Graphical object type selection & is incomplete |
675 | Graphical object type & not found |
676 | Object representation selection: status & sequence & cannot be checked. |
677 | Line representation selection: status & sequence & cannot be checked. |
678 | Graph.obj.type selection: status & sequence & cannot be checked. |
679 | Graphic object type: & index & is not valid. |
680 | & for requirements grouping & & not found. |
681 | & for capacity requirements & & & not found. |
682 | Chart profile & not found |
683 | Object representation profile for object selection & not found |
684 | Define CUA-status in control profile. |
685 | Chart &: No columns in table section. |
686 | "Drag & drop" profile & not found. |
687 | Requirements grouping empty. |
688 | Internal error: Change indicator not defined. |
689 | Communication error occurred in the planning table. |
690 | Window ID is invalid. |
691 | Graphics profile & & & no found |
692 | Time axis profile & not found |
693 | Unit of measure & not found |
694 | No components exist |
695 | Component & with rqmts date & and rqmts quantity & not available |
696 | Dispatching sequence for strategy profile & not maintained |
697 | Assignment of requirements grouping & to a chart is not possible |
698 | & & & & |
699 | & & & & |
700 | Sub-operations can not be dispatched |
701 | Order & operation & is not relevant for scheduling |
702 | Scheduling error -> Scheduling log |
703 | Order & operation & begins after start of a successor |
704 | Order & operation & finishes before end of a predecessor |
705 | Order & operation &: "Today" scheduling since time is in the past |
706 | No capacities have been defined for work center & |
707 | Order & operation & is not dispatched |
708 | Error on conversion of units & to seconds |
709 | Error on conversion of internal units of time: & & |
710 | Capacity header record & for work center & not found |
711 | Order & operation &: No capacity record found |
712 | Order & operation &: Max. interop. time to predecessor & exceeded |
713 | Order & operation &: Max. interop. time to successor & exceeded |
714 | Order & operation/phase & has the status "confirmed" |
715 | Order & operation/phase & has status "partially confirmed" |
716 | Capacity requirements record for capacity category & not found |
717 | Commitment record not found on capacity ID & |
718 | Order & phase & was dispatched |
719 | Order & operation &: Overlap conflict with predecessor & |
720 | Order & operation &: Overlap conflict with successor & |
721 | Order & operation & lies outside operation float |
722 | Order & operation & lies outside float before prod. + operation float |
723 | Order & operation & lies outside float after production |
724 | Order & operation & begins in the past |
725 | & does not belong to resource network structure & in plant & |
726 | & has no connection with predecessor & in res. netw. struct. & in plant & |
727 | & has no connection with successor & in res. netw. struct. & in plant & |
728 | Order & operation &: Minimum overlap with predecessor & not achieved |
729 | Order & operation &: Minimum overlap with successor & not achieved |
730 | Order & operation & and element were deallocated |
731 | Order & operation & suboperation & not relevant for scheduling |
732 | Order & operation & was dispatched to work center & |
733 | Order & operation & suboperation & was dispatched to work center & |
734 | Dispatching dates: & & - & & |
735 | Order & operation & starts before basic start date of order |
736 | Order & operation & finishes after basic finish date of order |
737 | Operation was changed. |
738 | Dispatched operation was changed. You should take long text into account. |
739 | Order & operation & has the status "confirmed" |
740 | Order & operation & has the status "partially confirmed" |
741 | Work center & for the operation was entered manually |
742 | Work center & for sub-operation & was entered manually |
743 | Order & phase &: No capacity requirements record found |
744 | Order & operation &: No remaining av. cap. available in planning period |
745 | Order & operation & suboperation &: No rem. available capacity available |
746 | Order & operation &: Work center was changed manually |
747 | Operation & sub-operation &: Work center was changed manually |
748 | Order & operation &: Start date limit exceeded |
749 | Order & operation &: Finish date limit exceeded |
750 | Order & operation &: Rescheduling not permitted because of status |
751 | Order & operation/phase & second. resource &: No rem. avail. cap. avail. |
752 | Split & person/individual capacity &: Scheduling error |
753 | Order &: Scheduling not possible |
754 | Order & operation &: Dispatching not permitted because of status |
755 | Order & operation &: Deallocation not permitted because of status |
756 | Order & operation & have already been dispatched |
757 | Order & operation &: Dispatching/rescheduling was not carried out |
758 | Availability check for order & could not be carried out. |
759 | Order & has missing materials |
760 | No setup time optimization - you have selected dispatched operations |
761 | All materials required for order & are available. |
762 | Order & operation & shifted due to operation sequence |
763 | Order & operation &: Planning step was undone (UNDO) |
764 | Order & operation &: Work center & is not allowed (Resource selection) |
765 | All rescheduling was undone (UNDO) |
766 | Order & Operation &: Displayed dates of operation cannot be changed |
767 | Order & operation/phase &: Errors when scheduling subobjects |
768 | Setup transitions are forbidden for all operations already dispatched |
769 | Dispatch at best time for setup: select one operation only |
770 | Setup optimiz.: syst.cannot find solution without forbidd. setup transit. |
800 | * entries for CY01_S_MESSAGE_SET * |
801 | You should look in the scheduling log and the planning log |
802 | You should look in the planning log |
803 | You should look in the scheduling log |
804 | Error when dispatching. You should look in the log. |
805 | Dispatching carried out successfully |
806 | Function not possible since no objects were selected |
807 | Function not possible since no relevant objects were selected |
808 | Current planning saved |
809 | There is no scheduling log |
810 | Function not possible |
811 | Function for the selected objects not possible |
812 | No planning log exists |
813 | No inspection characteristics |
814 | No inspection plan found |
815 | No time events |
816 | Partial lot does not exist |
817 | Work center not unambiguous |
818 | This function is not intended for maintenance orders |
819 | This function is not intended for networks |
820 | Assignment of requirements grouping & to a line is not possible |
821 | Selected date &1 is before the start of the time axis &2 |
822 | Chosen date &1 is near the end of the time axis &2 |
823 | No capacity available at selected work center |
824 | Saving not possible. Last saving operation still running. |
825 | No data exists to be saved. |
826 | Data was saved. |
827 | Function cannot be executed on the planning tables |
829 | No saving log exists |
830 | Data was saved. Look at the saving log. |
831 | Dispatching sequence: Structure &1 is not currently supported |
850 | *-----------------------------------------------------------------------* |
851 | *-- Fixed planning areas |
852 | *-----------------------------------------------------------------------* |
853 | Time interval not correct. |
854 | Start of period before start of planning period. |
855 | Fixing area after end of planning period |
856 | Interval entered already exists |
857 | Entry saved |
858 | No current profile found for the planning period |
859 | There is no planning profile |
860 | Layout keys have different number of fields |
861 | No fields have been maintained for the sort key |
862 | No sort keys defined for grouping |
863 | No sort key found for sort |
864 | Requirements group not found in requirements grouping |
865 | No status assignements defined in selection profile |
866 | The boolean expression for selection profile is corrupted |
867 | No field was assigned to this index |
868 | Index refers to a non-data field |
869 | Selection profile does not exist |
870 | Distribution key does not exist |
871 | Sort key does not exist |
872 | Graphical element not found |
873 | Form category not found |
874 | Color category not found |
875 | Object representation in graphical object type not found |
876 | No fields found for layout key |
877 | Sort not found |
878 | Color definition does not exist |
879 | Form group not found |
880 | No form categories found for form group |
881 | Form definition not found |
882 | Grouping not found |
883 | Set does not exist |
884 | Requirements grouping does not exist |
885 | Object representation selection not found |
886 | Representation profile not found |
887 | Selected capacity contains no requirements |
888 | No dispatched operations for selected capacity |
889 | Operations in fixed planning areas cannot be rescheduled |
890 | Operations in fixed time periods cannot be deallocated |
891 | Operation moved because of a fixed time period |
892 | Planning direction was changed. |
893 | Not all groups for requirements grouping are used |
894 | Inconsistent basic load structure for the capacities |
895 | Maximum number of splits (254) reached |
896 | The selected person is not qualified |
897 | The capacity requirements cannot be displayed in the unit & |