KALO - Costing Run: Costing Objects (KVMK)
Costing Run: Costing Objects (KVMK) information is stored in SAP table KALO.
It is part of development package CK in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development: PP Product Costing".
It is part of development package CK in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development: PP Product Costing".
Fields for table KALO
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
|---|---|---|---|---|---|---|
| MANDT | Client | X | MANDT | CLNT | 6 | * |
| KALAID | Name of Costing Run | X | CK_KALAID | CHAR | 16 | |
| KALADAT | Costing Run Date | X | CK_KALADAT | DATS | 16 | |
| TVERS | Costing Version | X | CK_TVERS | NUMC | 4 | |
| DISST | Low-Level Code | X | DISST | CHAR | 6 | |
| KALVZAE | Numerator for Costing Run Tables (KAL*) | X | CK_KALVZAE | INT4 | 4 | |
| SELKZ | Checkbox | XFELD | CHAR | 2 | ||
| WERKS | Plant | WERKS_D | CHAR | 8 | T001W | |
| VBELN | Sales and Distribution Document Number | VBELN | CHAR | 20 | * | |
| POSNR | Item number of the SD document | POSNR | NUMC | 12 | * | |
| MATNR | Material Number | MATNR | CHAR | 80 | MARA | |
| VERID | Production Version | VERID | CHAR | 8 | * | |
| STLAN | BOM Usage | STLAN | CHAR | 2 | T416 | |
| STNUM | Bill of Material | STNUM | CHAR | 16 | ||
| STALT | Alternative BOM | STALT | CHAR | 4 | ||
| PLNTY | Task List Type | PLNTY | CHAR | 2 | TCA01 | |
| PLNNR | Key for Task List Group | PLNNR | CHAR | 16 | ||
| PLNAL | Group Counter | PLNAL | CHAR | 4 | ||
| PLNCT | Internal counter | CIM_COUNT | NUMC | 16 | ||
| LOSGR | Planned lot size | LOSGR | QUAN | 7 | ||
| SUMLO | Planned lot size | LOSGR | QUAN | 7 | ||
| MEINS | Base Unit of Measure | MEINS | UNIT | 6 | T006 | |
| KADAT | Date | DATUM | DATS | 16 | ||
| ROHSTOFF | Material Component | CK_ROH | CHAR | 2 | ||
| SUMMENSATZ | Checkbox | XFELD | CHAR | 2 | ||
| BIDAT | Costing Date To | CK_BIDAT | DATS | 16 | ||
| ALDAT | Quantity Structure Date for Costing | CK_BRDAT | DATS | 16 | ||
| BEDAT | Requirements Date | CK_BEDAT | DATS | 16 | ||
| BWDAT | Valuation Date of a Cost Estimate | CK_BWDAT | DATS | 16 | ||
| FEH_A_ANZ | No. System Messages in Selection/Qty Structure Determination | CK_FEH_ANZ | INT4 | 4 | ||
| FEH_K_ANZ | Number of System Messages in Costing | CK_FEH_ANK | INT4 | 4 | ||
| FEH_STATUS | Costing Status | CK_FEH_STA | CHAR | 4 | ||
| KALNR | Cost Estimate Number - Product Costing | CK_KALNR1 | NUMC | 24 | * | |
| BWTAR | Valuation Type | BWTAR_D | CHAR | 20 | * | |
| ERFNM | Entered By | ERFNM | CHAR | 24 | ||
| DISPO | MRP Controller | DISPO | CHAR | 6 | T024D | |
| EKGRP | Purchasing Group | EKGRP | CHAR | 6 | T024 | |
| LABOR | Laboratory/design office | LABOR | CHAR | 6 | T024L | |
| VAGRP | Responsible Planner Group or Department | VAGRP | CHAR | 6 | T024A | |
| SOBSL | Special Procurement Key for the Costing Object | CK_SOBSK | CHAR | 4 | T460A | |
| SOWRK | Special Procurement Plant - Costing | CK_SOWRK | CHAR | 8 | * | |
| KOSGR | Costing Overhead Group | CK_KOSGR | CHAR | 20 | * | |
| FEH_STATUF | Costing Status for Marked/Released Objects | CK_FEH_STF | CHAR | 4 | ||
| LOSAU | Lot Size Taking Scrap into Account | CK_LOSAU | QUAN | 7 | ||
| CUOBJ | Object Number for Conf. Objects | CK_CUOBJ | NUMC | 36 | ||
| CUOBJID | Indicator for Configurable Objects | CK_CUOBJID | CHAR | 2 | ||
| TYPE | Configured Material (Variant) | CK_TYPE | CHAR | 80 | MARA | |
| PROZESS | Process Through Which Co-Product Was Costed | CK_PROZESS | CHAR | 80 | * | |
| KZKUP | Indicator: Material can be co-product | KZKUPMAT | CHAR | 2 | ||
| PR_LOSGR | Planned lot size | LOSGR | QUAN | 7 | ||
| PR_SUMLO | Planned lot size | LOSGR | QUAN | 7 | ||
| PR_LOSAU | Lot Size Taking Scrap into Account | CK_LOSAU | QUAN | 7 | ||
| PR_MEINS | Base Unit of Measure | MEINS | UNIT | 6 | T006 | |
| PR_VERID | Production Version To Be Costed | CK_VERID | CHAR | 8 | MKAL | |
| STVFIX | Checkbox | XFELD | CHAR | 2 | ||
| SBDKZ | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | CHAR | 2 | ||
| ALTSL | Method for Selecting Alternative Bills of Material | ALTSL | CHAR | 2 | ||
| MLMAA | Material Ledger Activated at Material Level | CK_ML_MAAC | CHAR | 2 | ||
| BESKZ | Procurement Type | BESKZ | CHAR | 2 | ||
| AUSSS | Assembly scrap in percent | AUSSS | DEC | 3 | ||
| PRCTR | Profit Center | PRCTR | CHAR | 20 | * | |
| SPART | Division | SPART | CHAR | 4 | * | |
| MTART | Material type | MTART | CHAR | 8 | T134 |