TCY08 - Option profiles

Option profiles information is stored in SAP table TCY08.
It is part of development package CY in software component PP-CRP-ALY. This development package consists of objects that can be grouped under "R/3 Application development: Capacity Planning".

Fields for table TCY08

Field Name
Description
Is Key
Data Element
Data Type
Length
Check Table
MANDTClientXMANDTCLNT3T000
DARPROF_IDID of a user-spec. profile in the table for option profilesXDARPROF_IDCHAR10
HIEVERCumulate capacity requirements using work center hierarchyHIEVERCHAR1
HIEAUFExplode hierarchyHIEAUFCHAR1
KUMULIndicator, whether cumulated display is desiredKUMULDCHAR1
MINBELMinimum load that will be displayedMINBELADEC2
MAXBELMaximum load that will be displayedMAXBELADEC2
RUECKDATOffset (in days) of dispatch date for backlog to curr. dateRDATUM_CNTDEC3
PEINHEITUnit in which the period duration is specified (day, week..)DAPERCHAR1
PDAUERDuration of a period (units as specified in period type)DAPEDDEC2
LIBARTRequirements category (scheduled or remaining)CY_SBARTCHAR1
LIDAVCNTOffset (in days) of start date for lists to current dateCY_DCNTVDEC3
LIDABCNTOffset (in days) of end date for lists to current dateCY_DCNTBDEC3
LIEINHUnit of Measure for Capacity RequirementsCY_KEINHUNIT3T006
DAVAPDistribution according to key in work center or operationDAVAPCHAR1
HNAMEName of HierarchyCR_HNAMECHAR10
HWERKSPlantWERKS_DCHAR4T001W
VERTL1Distribution of Capacity Requirements (Planned/Prodn Order)CR_VERTLCHAR8TC29
VERTLNDistr.cap.reqmts (plant maint.,process order, network)CR_VERTLNCHAR8TC29
POOLKAPIndicator: Cumulated view of the rqmts of pooled capacityCY_POOLKAPCHAR1
TT_FAUFTIndicator: Branch to production order - change or displayCY_TTFAUFTCHAR1
TT_PAUFTIndicator: Branch to planned order display or maintenanceCY_TTPAUFTCHAR1
TT_ARBPLSwitch: Branch to work center - change or displayCY_TTARBPLCHAR1
ANVERCumulate available capacity using work center hierarchyCY_ANVERCHAR1
DATEFROMStart date for output of capacity evaluationsCY_DATEFCHAR10
DATETOFinish date for output of capacity evaluationsCY_DATETCHAR10
RDATE_TYPEType of date specificationCY_RDATETYCHAR1
RDATEDate of backlog dispatchingCY_RDATECHAR10
MRPPPPC Planning CalendarMRPPPCHAR3T439G
UNITSOURCEOrigin of unit of measure for available cap. and cap.reqmtsCY_UNITSRCCHAR1
PPSWERKPlantWERKS_DCHAR4T001W
Privacy Policy