VSAFKO_CN - Version: Order header data for PP orders

Version: Order header data for PP orders information is stored in SAP table VSAFKO_CN.
It is part of development package CNVS in software component PS-SIM. This development package consists of objects that can be grouped under "R/3 Application development: Version Management".

Fields for table VSAFKO_CN

Field Name
Description
Is Key
Data Element
Data Type
Length
Check Table
MANDTClientXMANDTCLNT6T000
.INCLUDEXVSKEY_INC0
VSNMRNumber or description of a versionXVSNMRCHAR24
AUFNROrder NumberXAUFNRCHAR24VSAUFK_CN
.INCLUDEAFKO_INC0
GLTRPBasic finish dateCO_GLTRPDATS16
GSTRPBasic Start DatePM_ORDGSTRPDATS16
FTRMSScheduled release dateCO_FTRMSDATS16
GLTRSScheduled finishCO_GLTRSDATS16
GSTRSScheduled startCO_GSTRSDATS16
GSTRIActual start dateCO_GSTRIDATS16
GETRIConfirmed Order Finish DateCO_GETRIDATS16
GLTRIActual finish dateCO_GLTRIDATS16
FTRMIActual release dateCO_FTRMIDATS16
FTRMPPlanned Release DateCO_FTRMPDATS16
RSNUMNumber of reservation/dependent requirementsRSNUMNUMC20*
GASMGTotal Scrap Quantity in the OrderGASMGQUAN7
GAMNGTotal Order QuantityGAMNGQUAN7
GMEINBase Unit of MeasureMEINSUNIT6T006
PLNBEZMaterial NumberMATNRCHAR80MARA
PLNTYTask List TypePLNTYCHAR2
PLNNRKey for Task List GroupPLNNRCHAR16
PLNAWApplication of the task listPLNAWCHAR2TCA09
PLNALGroup CounterPLNALCHAR4
PVERWTask List UsagePLN_VERWECHAR6T411
PLAUFDate for Routing ExplosionCO_PLAUFDATS16
PLSVBMaximum Lot SizeLOSGRBISQUAN7
PLNMETask List Unit of MeasurePLNMEUNIT6T006
PLSVNMinimum Lot SizeLOSGRVONQUAN7
PDATVValid-From DateDATUVDATS16
PAENRChange NumberAENNRCHAR24AENR
PLGRPResponsible Planner Group or DepartmentVAGRPCHAR6T024A
LODIVLot size divisor (not used)LOSDIVQUAN7
STLTYBOM categorySTLTYCHAR2
STLBEZMaterial NumberMATNRCHAR80MARA
STLSTBill of Material StatusSTLSTNUMC4T415S
STLNRBill of MaterialSTNUMCHAR16
SDATVValid-From DateDATUVDATS16
SBMNGBase quantityBASMNQUAN7
SBMEHBase Unit of MeasureMEINSUNIT6T006
SAENRChange NumberAENNRCHAR24AENR
STLALAlternative BOMSTALTCHAR4
STLANBOM UsageSTLANCHAR2T416
SLSVNFrom Lot SizeLOSVNQUAN7
SLSBSTo Lot SizeLOSBSQUAN7
AUFLDDate of BOM Explosion/Routing TransferCO_AUFLDDATS16
DISPOMRP controller for the orderCO_DISPOCHAR6T024D
AUFPLRouting number of operations in the orderCO_AUFPLNUMC20
FEVORProduction SupervisorFEVORCHAR6T024F
FHORIScheduling Margin Key for FloatsFHORICHAR6T436A
TERKZScheduling typeTERMKZCHAR2T482
REDKZReduction indicator for schedulingREDKZCHAR2
APRIOOrder priorityCO_APRIOCHAR2
NTZUESuperior network numberNETZ_UEBERCHAR24AUFK
VORUESuperior activityVORG_UEBERCHAR8
PROFIDNetwork ProfilePROFIDNZPLCHAR14TCN41
VORGZFloat before production (in days)VORGZNUMC6
SICHZFloat after production (in days)SICHZNUMC6
FREIZRelease period (in days)FREIZNUMC6
UPTERIndicator: Change to Scheduled DatesCO_UPTERCHAR2
BEDIDID of the Capacity Requirements RecordBEDIDNUMC24*
PRONRProject definitionPS_PSP_PRONUMC16VSPROJ_CN
MZAEHLInternal counterCIM_COUNTNUMC16
PRUEFLOSInspection Lot NumberQPLOSNUMC24QALS
KLVARPCosting Variant for Planned CostsKALKVARPLNCHAR8TCK03
KLVARICosting Variant For Actual CostsKALKVARISTCHAR8TCK03
RGEKZIndicator: Backflushing for orderCO_RGEKZCHAR2
PLARTBasis for schedulingPS_PLARTCHAR2
FLG_AOBIndicator: relationshipsFLG_AOBCHAR2
FLG_ARBEIIndicator: Default value work is relevantFLG_ARBEICHAR2
GLTPPFinish date (forecast)CO_GLTPPDATS16
GSTPPForecast start dateCO_GSTPPDATS16
GLTPSScheduled forecast finishCO_GLTPSDATS16
GSTPSScheduled forecast startCO_GSTPSDATS16
FTRPSScheduled release date (forecast)CO_FTRPSDATS16
RDKZPReduction indicator for scheduling (forecast)REDKZPCHAR2
TRKZPScheduling type (forecast)TERMKZPCHAR2T482
RUECKCompletion confirmation number for the operationCO_RUECKNUMC20
RMZHLInternal counterCIM_COUNTNUMC16
IGMNGConfirmed Yield Quantity From Order ConfirmationCO_IGMNGQUAN7
RATID-INVALID FOR S/4- Index for the rslts of schedg prod. ratesRATIDNUMC24*
GROID-INVALID FOR S/4- Index for rough scheduling resultsGROIDNUMC24*
CUOBJConfiguration (internal object number)CUOBJNUMC36
GLUZSScheduled finish timeCO_GLUZSTIMS12
GSUZSScheduled Start (Time)CO_GSUZSTIMS12
REVLVRevision LevelREVLVCHAR4
RSHTYObject types of the CIM resourceCR_OBJTYCHAR4
RSHIDObject ID of the resourceCR_OBJIDNUMC16CRID
RSNTYObject types of the CIM resourceCR_OBJTYCHAR4
RSNIDObject ID of the resourceCR_OBJIDNUMC16CRID
NAUTERMIndicator: Do not schedule automaticallyCO_NAUTERMCHAR2
NAUCOSTIndicator: Do not cost automaticallyCO_NAUCOSTCHAR2
STUFELevel (in multi-level BOM explosions)HISTUDEC2
WEGXXPath (for multi-level BOM explosions)WEGXXDEC3
VWEGXPath (for multi-level BOM explosions)WEGXXDEC3
ARSNRNumber of reservation/dependent requirementsRSNUMNUMC20*
ARSPSOrder item numberCO_POSNRNUMC8
MAUFNRNumber of Superior OrderMAUFNRCHAR24*
LKNOTLeft node in collective orderCO_LKNOTCHAR24*
RKNOTRight node of a collective orderCO_RKNOTCHAR24*
PRODNETOrder is Part of Collective OrderCO_PRODNETCHAR2
IASMGConfirmed Scrap Quantity From Order ConfirmationCO_IASMGQUAN7
ABARBConfirmation: Degree of processingCO_ABARBNUMC6
AUFNTNumber of superior networkCO_TEILNETCHAR24*
AUFPTRouting number of operations in the orderCO_AUFPLNUMC20
APLZTGeneral counter for orderCO_APLZLNUMC16*
NO_DISPEffective for Materials PlanningNO_DISP_PLUSCHAR2
CSPLITApportionment StructureCSPLITCHAR8MAKV
AENNRChange NumberAENNRCHAR24AENR
CY_SEQNRSequence Number OrderCY_SEQNRNUMC28
BREAKSIndicator: Scheduling allowing for breaksBREAKSCHAR2
VORGZ_TRMScheduled float before production in daysVORGZ_TRMDEC4
SICHZ_TRMScheduled float after production in daysSICHZ_TRMDEC4
TRMDTDate of the Last SchedulingTRMDTDATS16
GLUZPBasic Finish (Time)CO_GLUZPTIMS12
GSUZPBasic Start (Time)CO_GSUZPTIMS12
GSUZIActual start timeCO_GSUZITIMS12
GEUZIConfirmed Order Finish (Time)CO_GEUZITIMS12
GLUPPForecast finish (time)CO_GLUPPTIMS12
GSUPPForecast start (time)CO_GSUPPTIMS12
GLUPSScheduled forecast finish timeCO_GLUPSTIMS12
GSUPSScheduled start time (Forecast)CO_GSUPSTIMS12
CHSCHSearch Procedure for Batch DeterminationKALSMA_CHCHAR12T683
KAPT_VORGZFloat (bef. production) remaining after finite schedulingKAPT_VORGZNUMC6
KAPT_SICHZRemaining float after finite schedulingKAPT_SICHZNUMC6
LEAD_AUFNRLeading Order in Current ProcessingCO_LAUFNRCHAR24AUFK
PNETSTARTDOutline start of collective network (date)CO_PSTARTDDATS16
PNETSTARTTStart time of a collective orderCO_PSTARTTTIMS12
PNETENDDOutline finish of collective order (date)CO_PENDDDATS16
PNETENDTOutline finish timeCO_PENDTTIMS12
KBEDIndicator: Do not Create Capacity RequirementsKBED_DCHAR2
KKALKRIndicator: Components will not be costedCOMP_CALCCHAR2
SFCPFProduction Scheduling ProfileCO_PRODPRFCHAR12TCO43
RMNGATotal Confirmed Rework QuantityRMNGAQUAN7
GSBTRTotal Commitment DateCO_GSBTRDATS16
VFMNGCommitted quantity for order acc. to ATP check componentsCO_VFMNGQUAN7
NOPCOSTDo not calculate planned costs for orderCO_NOPCOSTCHAR2
NETZKONTIndicator for the account assignment of a network(hdr/act.)NETZKONTCHAR2
ATRKZRequest IDATRKZCHAR2
OBJTYPEChange indicatorOCM_OBJ_TYPECHAR2
CH_PROCProcess that has lead to the change of an objectOCM_CH_PROCCHAR2
KAPVERSAVersion of Available CapacityKAPVERSANUMC4*
COLORDPROCCollective order with/without automatic goods movementCO_COLORDPRCCHAR2
KZERBIndicator: Project summarization via master data charact.PS_KZERBCHAR2
CONF_KEYIdentical objectCC_CONF_KEYNUMC16
ST_ARBIDObject IDOBJEKTIDNUMC16
VSNMR_VSales document version numberVSNMR_VCHAR24
TERHWScheduling note from order schedulingTERHWCHAR2
SPLSTATStatus of an Order in a Split HierarchySPLIT_STATCHAR2
COSTUPDCosts are updatedCN_COSTUPDCHAR2
MAX_GAMNGMaximum Value of Total Order Quantity After DistributionCO_MES_MAX_GAMNGQUAN7
MES_ROUTINGIDKey of a Routing from an ME SystemCO_MES_INT_ROUTINGIDCHAR128
TL_VERSNRouting VersionPLNVERSNCHAR8
BOM_VERSNBOM VersionCS_VERSNCHAR8
FLEXIBLE_PROCESSINGFlexible ProcessingMPE_FLEXIBLE_PROCESSINGCHAR2
.INCLU--APADAKO0
ADPSPPM/PS Reference ElementADCOMPARECHAR80
.INCLUDEAUFK_RMA0
RMANRSales and Distribution Document NumberVBELNCHAR20
POSNR_RMAItem number of the SD documentPOSNRNUMC12
POSNV_RMAItem number of the SD documentPOSNRNUMC12
.INCLUDECFB_BBD_PPPI_DATA0
CFB_MAXLZMaximum Storage PeriodMAXLZDEC3
CFB_LZEIHUnit for maximum storage periodLZEIHUNIT6T006
CFB_ADTDAYSAdditional DaysCFB_ADTDAYSDEC3
CFB_DATOFMDate of ManufactureCFB_DATOFMDATS16
CFB_BBDPIBest-Before Date (BBD)/ Shelf Life Expiration Date (SLED)CFB_BBD_PPPIDATS16
AUTERMIndicator: Schedule automaticallyCO_AUTERMCHAR2
AUCOSTIndicator: Cost automaticallyCO_AUCOSTCHAR2
OIHANTYPExcise Duty Handling TypeOIH_HANTYPCHAR4
.INCLU--APFSH_VSAFKO_APPEND0
FSH_MPROD_ORDMaster Production Order NumberFSH_MPROD_ORDCHAR24
FLG_BUNDLEIndicates Bundle Information MaintainedFLG_BUNDLECHAR2
.INCLU--APMILL_CO_VSAFKO0
MILL_RATIOFactor for Quantity-Based SettlementMILL_RATIOINT44
.INCLU--APMILL_OC_VSAFKO0
BMEINSBase Unit of MeasureMEINSUNIT6*
BMENGEBase quantityBASMNQUAN7
MILL_OC_ZUSKZCombination IndicatorMILL_OC_ZUSKZCHAR2
Privacy Policy