KEKO - Product Costing - Header Data
Product Costing - Header Data information is stored in SAP table KEKO.
It is part of development package CK in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development: PP Product Costing".
It is part of development package CK in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development: PP Product Costing".
Fields for table KEKO
Field Name | Description | Is Key | Data Element | Data Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | Client | X | MANDT | CLNT | 6 | |
BZOBJ | Reference Object | X | CK_OBJ | CHAR | 2 | |
KALNR | Cost Estimate Number - Product Costing | X | CK_KALNR1 | NUMC | 24 | CKHS |
KALKA | Costing Type | X | CK_KALKA | CHAR | 4 | |
KADKY | Costing Date (Key) | X | CK_KADKY | DATS | 16 | |
TVERS | Costing Version | X | CK_TVERS | NUMC | 4 | |
BWVAR | Valuation Variant in Costing | X | CK_BWVAR | CHAR | 6 | TCK05 |
KKZMA | Costs Entered Manually in Additive or Automatic Cost Est. | X | CK_KKZMA | CHAR | 2 | |
MATNR | Material Number | MATNR | CHAR | 80 | MARA | |
WERKS | Plant | WERKS_D | CHAR | 8 | T001W | |
BWKEY | Valuation area | BWKEY | CHAR | 8 | T001K | |
BWTAR | Valuation Type | BWTAR_D | CHAR | 20 | T149D | |
KOKRS | Controlling Area | KOKRS | CHAR | 8 | TKA01 | |
KADAT | Costing Date From | CK_ABDAT | DATS | 16 | ||
BIDAT | Costing Date To | CK_BIDAT | DATS | 16 | ||
KADAM | Costing Date From | CK_ABDAT | DATS | 16 | ||
BIDAM | Costing Date To | CK_BIDAT | DATS | 16 | ||
BWDAT | Valuation Date of a Cost Estimate | CK_BWDAT | DATS | 16 | ||
ALDAT | Quantity Structure Date for Costing | CK_BRDAT | DATS | 16 | ||
BEDAT | Requirements Date | CK_BEDAT | DATS | 16 | ||
VERID | Production Version | VERID | CHAR | 8 | ||
STNUM | Bill of Material | STNUM | CHAR | 16 | ||
STLAN | BOM Usage | STLAN | CHAR | 2 | ||
STALT | Alternative BOM | STALT | CHAR | 4 | ||
STCNT | Internal counter | CIM_COUNT | NUMC | 16 | ||
PLNNR | Key for Task List Group | PLNNR | CHAR | 16 | ||
PLNTY | Task List Type | PLNTY | CHAR | 2 | ||
PLNAL | Group Counter | PLNAL | CHAR | 4 | ||
PLNCT | Internal counter | CIM_COUNT | NUMC | 16 | ||
LOEKZ | Deletion Indicator for Product Costing | CK_LOEKZ | CHAR | 2 | ||
LOSGR | Lot Size for Product Costing | CK_LOSGR | QUAN | 7 | ||
MEINS | Valuation Unit of Measure | CK_MEINH_BEW | UNIT | 6 | T006 | |
ERFNM | Costed by User | CK_KALKUSR | CHAR | 24 | ||
ERFMA | User ID of Person Who Created Additive Cost Estimate | CK_ERFMA | CHAR | 24 | ||
CPUDT | Date on Which Cost Estimate Was Created | CK_CPUDT | DATS | 16 | ||
CPUDM | Date on Which Additive Cost Estimate Was Saved | CK_CPUDM | DATS | 16 | ||
CPUTIME | System Time | SYUZEIT | TIMS | 12 | ||
FEH_ANZ | No. System Messages in Selection/Qty Structure Determination | CK_FEH_ANZ | INT4 | 4 | ||
FEH_K_ANZ | Number of System Messages in Costing | CK_FEH_ANK | INT4 | 4 | ||
FEH_STA | Costing Status | CK_FEH_STA | CHAR | 4 | ||
MAXMSG | Message Type | SYMSGTY | CHAR | 2 | ||
FREIG | Release of Standard Cost Estimate | CK_FREIG | CHAR | 2 | ||
MKALK | Mixed Costing Indicator | CK_MKALK | CHAR | 2 | ||
BALTKZ | Cost Estimate for a Procurement Alternative | CK_BALT_FLAG | CHAR | 2 | ||
KALNR_BA | Cost Estimate Number of Procurement Alternative | CKKALNRBA | NUMC | 24 | ||
BTYP | Process Category | CKML_BTYP | CHAR | 8 | ||
MISCH_VERH | Mixed Costing: Mixing Ratio | CK_MISCHVERH | DEC | 7 | ||
BWVAR_BA | Valuation Variant of Procurement Alternative | CK_BWVAR_BA | CHAR | 6 | ||
PLSCN | Planning Scenario in Long-Term Planning | PLSCN | NUMC | 6 | ||
PLMNG | Production Plan Quantity Transferred to the Cost Estimate | CKI_PLMNG | QUAN | 8 | ||
SOBSL | Special Procurement Key for the Costing Object | CK_SOBSK | CHAR | 4 | ||
SOBES | Special procurement type | SOBES | CHAR | 2 | ||
SOWRK | Special Procurement Plant - Costing | CK_SOWRK | CHAR | 8 | ||
SOBWT | Valuation Type from Special Procurement | CK_SOBWT | CHAR | 20 | ||
SODIR | Indicator for Direct Production (Collective Order) | CLCOR | CHAR | 2 | ||
SODUM | Phantom item indicator | DUMPS | CHAR | 2 | ||
KALSM | Costing Sheet for Calculating Overhead | CK_KALSM | CHAR | 12 | T683 | |
AUFZA | Overhead Type | AUFZA | CHAR | 2 | ||
BWSMR | Valuation Strategy for Raw Materials and Purchased Parts | CK_BWSMR | CHAR | 2 | ||
SUBSTRAT | Substrategy for Material Valuat. with Purchasing Info Record | CK_SUBSTRAT | CHAR | 2 | ||
RLDNR | Ledger in General Ledger Accounting | FINS_LEDGER | CHAR | 4 | ||
KLVAR | Costing Variant | CK_KLVAR | CHAR | 8 | TCK03 | |
KOSGR | Costing Overhead Group | CK_KOSGR | CHAR | 20 | TCK14 | |
POPER | Posting period | POPER | NUMC | 6 | ||
BDATJ | Posting Date YYYY | BDATJ | NUMC | 8 | ||
STKOZ | Internal counter | CIM_COUNT | NUMC | 16 | ||
TOPKA | Top Cost Estimate (Point-of-Entry Position) | CK_TOPKA | CHAR | 2 | ||
CMF_NR | Error Management Number | CMF_NR | NUMC | 24 | ||
OCS_COUNT | Number of OCS Messages Sent | CMF_OCSCNT | NUMC | 10 | ||
OBJNR | Object number | J_OBJNR | CHAR | 44 | ||
ERZKA | Cost Estimate Created with Product Costing | CK_ERZKA | CHAR | 2 | ||
LOSAU | Lot Size Taking Scrap into Account | CK_LOSAU | QUAN | 7 | ||
AUSID | Assembly/Operation Scrap Included | CK_AUSID | CHAR | 2 | ||
AUSSS | Assembly scrap in percent | AUSSS | DEC | 3 | ||
SAPRL | Release the document as it was last saved | KK_SAPRL | CHAR | 8 | ||
KZROH | Material Component | CK_KZROH | CHAR | 2 | ||
AUFPL | Routing No. for Operations with Non-Order-Related Production | CK_AUFPL | NUMC | 20 | ||
CUOBJ | Object Number for Conf. Objects | CK_CUOBJ | NUMC | 36 | ||
CUOBJID | Indicator for Configurable Objects | CK_CUOBJID | CHAR | 2 | ||
TECHS | Parameter Variant/Standard Variant | TECHS | CHAR | 24 | ||
TYPE | Configured Material (Variant) | CK_TYPE | CHAR | 80 | MARA | |
WRKLT | Plant (Variant) | CK_WRKLT | CHAR | 8 | ||
VORMDAT | Date on Which Cost Estimate Was Marked | CK_VORMDAT | DATS | 16 | ||
VORMUSR | User Who Marked Cost Estimate in Material Master | CK_VORMUSR | CHAR | 24 | ||
FREIDAT | Date on Which Cost Estimate Released in Material Master | CK_FREIDAT | DATS | 16 | ||
FREIUSR | User Who Released Cost Estimate in Material Master Record | CK_FREIUSR | CHAR | 24 | ||
UEBID | Transfer Control | CK_UEBID | CHAR | 8 | ||
PROZESS | Process Through Which Co-Product Was Costed | CK_PROZESS | CHAR | 80 | ||
PR_VERID | Production Version To Be Costed | CK_VERID | CHAR | 8 | MKAL | |
CSPLIT | Apportionment Structure | CSPLIT | CHAR | 8 | ||
KZKUP | Indicator: Material can be co-product | KZKUPMAT | CHAR | 2 | ||
FXPRU | Fixed-Price Co-Product | CK_FIXPRKU | CHAR | 2 | ||
CFXPR | Cost Estimate Contains Fixed-Price Co-Products | CK_CONTFIXPRICE | CHAR | 2 | ||
SUMZIFFR | Sum of Equivalence Numbers of Co-Products for a Process | CK_SUMZIFFR | DEC | 3 | ||
AFAKT | Costg.: Apportionment Factor for Itemiz. Line in Joint Prod. | CK_SPLITFAC | FLTP | 8 | ||
VBELN | Sales and Distribution Document Number | VBELN | CHAR | 20 | ||
POSNR | Item number of the SD document | POSNR | NUMC | 12 | ||
PSPNR | Work Breakdown Structure Element (WBS element) | WB_POSNR | NUMC | 16 | ||
SBDKZ | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | CHAR | 2 | ||
MLMAA | Material Ledger Activated at Material Level | CK_ML_MAAC | CHAR | 2 | ||
BESKZ | Procurement Type | BESKZ | CHAR | 2 | ||
DISST | Low-Level Code | DISST | CHAR | 6 | ||
KALST | Costing Level | CK_KALST | NUMC | 8 | ||
TEMPLATE | Template | ABC_TEMPL | CHAR | 20 | ||
PATNR | Partner number for costing | NKPRTN | NUMC | 12 | ||
PART_VRSN | Partner Version | CK_PARVRSN | NUMC | 4 | ||
ELEHK | Cost Component Structure - CGM and Sales/Administr. Costs | CK_ELESMHK | CHAR | 4 | ||
ELEHKNS | Cost Component Structure for Auxiliary Cost Component Split | CK_ELESMNS | CHAR | 4 | ||
VOCNT | Counter for Marking a Cost Estimate | CK_VOCNT | NUMC | 2 | ||
GSBER | Business Area | GSBER | CHAR | 8 | ||
PRCTR | Profit Center | PRCTR | CHAR | 20 | ||
SEGUNIT | Valuation Segmentation Unit | FINS_SEGMENTATION_UNIT | CHAR | 60 | ||
.INCLUDE | IDA_TCK32 | 0 | ||||
TPVAR | Variant for Finding Transfer Price | TPVARIANT | CHAR | 6 | TPVAR1 | |
KURST | Exchange Rate Type | KURST | CHAR | 8 | TCURV | |
MGTYP | Quantity Structure Type | CKML_MGTYP | CHAR | 10 | CKMLMV006 | |
HWAER | Local Currency | HWAER | CUKY | 10 | ||
FWAER_KPF | Currency Key | WAERS | CUKY | 10 | ||
REFID | Reference Variant | CK_REFID | NUMC | 4 | ||
MEINH_WS | Batch-specific matl unit of measure (proportion/prod. unit) | LRMEI_WS | UNIT | 6 | ||
KZWSO | Units of measure usage | KZWSO | CHAR | 2 | ||
ASL | Cost Estimate of an Order BOM | CK_ASL | CHAR | 2 | ||
KALAID | Name of Costing Run | CK_KALAID | CHAR | 16 | ||
KALADAT | Costing Run Date | CK_KALADAT | DATS | 16 | ||
OTYP | Object Type | CKML_OTYP | CHAR | 4 | ||
BVC_SOBSL_USE | Use special procurement stock transfer for broken val. chain | CK_BVC_SOBSL_USE | CHAR | 2 | ||
BAPI_CREATED | Cost Estimate Generated by BAPI | CK_BAPI | CHAR | 2 | ||
SGT_SCAT | Stock Segment | SGT_SCAT | CHAR | 80 | ||
.INCLUDE | DATA_EXTENSION_CK | CI_KEKO | 0 | |||
.INCLUDE | KEKO_SI_CFIN | 0 | ||||
LOGSYSTEM_SENDER | Logical System of the Sender | LOGSYSTEM_SENDER | CHAR | 20 | * | |
BZOBJ_SENDER | Reference Object | CK_OBJ | CHAR | 2 | * | |
KALNR_SENDER | Cost Estimate Number - Product Costing of the Sender | CK_KALNR1_SENDER | NUMC | 24 | * | |
KALKA_SENDER | Costing Type | CK_KALKA | CHAR | 4 | * | |
KADKY_SENDER | Costing Date (Key) | CK_KADKY | DATS | 16 | ||
TVERS_SENDER | Costing Version | CK_TVERS | NUMC | 4 | ||
BWVAR_SENDER | Valuation Variant in Costing | CK_BWVAR | CHAR | 6 | * | |
KKZMA_SENDER | Costs Entered Manually in Additive or Automatic Cost Est. | CK_KKZMA | CHAR | 2 | ||
.INCLU--AP | /CWM/KEKO | 0 | ||||
.INCLUDE | /CWM/CK_HEADER_LOTSIZE | 0 | ||||
/CWM/XCWMAT | Material Is Activated for CW | /CWM/XCWMAT | CHAR | 2 | ||
/CWM/LOSGR_BAS | Costing Lot Size in Base Unit of Measure | /CWM/CK_LOSGR_BAS | QUAN | 7 | ||
/CWM/MEINH_BAS | Base Unit of Measure | MEINS | UNIT | 6 | * | |
/CWM/LOSGR_BEW | Costing Lot Size in Valuation Unit of Measure | /CWM/CK_LOSGR_BEW | QUAN | 7 | ||
/CWM/MEINH_BEW | Valuation Unit of Measure | /CWM/CK_MEINH_BEW | UNIT | 6 | * | |
CRULE | Cost Apportionment Methods | CSPLITRULE | CHAR | 2 | ||
.INCLU--AP | KEKO_BOS | 0 | ||||
PACKNO | Package number | PACKNO | NUMC | 20 | * | |
INTROW | Internal line number for limits | INTROW | NUMC | 20 | ||
BOSFSHT | Schema for Additions/Deductions | BOSFSHT | CHAR | 8 | ||
BOSDVERSION | Version | BOSDVERS | NUMC | 6 | ||
.INCLU--AP | KEKO_GRC | 0 | ||||
GRC_COSTING | Goods Receipt Costing | CK_GRC_COSTING | CHAR | 2 | ||
.INCLU--AP | KEKO_IPPE | 0 | ||||
.INCLUDE | KEKO_IPPE | CKF_KEKO_IPPE | 0 | |||
CLINT | Internal Class Number | CLINT | NUMC | 20 | * | |
PPEGUID | Internal Identification for PVS Objects | PVS_GUID | RAW | 16 | ||
OTYPE | iPPE Object Type | PVS_OTYPE | CHAR | 2 | ||
APPLOBJ_TYPE | Application Object Type for iPPE | PVS_APPLOBJ_TYPE | CHAR | 8 | ||
AENNR | Change Number | AENNR | CHAR | 24 | * | |
.INCLU--AP | KEKO_KALM_IPPE | 0 | ||||
IPPE_COSTING | Costing for a Material with iPPE Quantity Structure | CK_IPPE_COSTING | CHAR | 2 | ||
CMPEXT_NONCOL | Internal Identification of the Component (Material/Product) | PVS_CMPID | CHAR | 80 | ||
CCODE | Color Supplement Key | PVS_COL_CODE | CHAR | 20 | ||
NONCOL_VERID | Production Version | VERID | CHAR | 8 | * |